Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM03193
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/27/2020 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Square footages and occupant loads are all over the place. Sheet T1.0 occupancy load calcs square footage adds up to 9,161 sq. ft. Sheet SP1.0 indicates 9,091 sq. ft. Sheet A1.1 states the gross area of the building is 8,473, but the calculation says 8,205. Please resolve. Under egress requirements (sheet A1.1), provided number of exits should be 2, not 1. |
05/28/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
05/28/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet T1.0 (Project Information); Sheet A1.1 (Egress Legend): The Project Information indicates 9091 SF and 140 occupants, while the Egress Legend indicates 8473 SF and 237 occupants. Please coordinate. 2. Sheet A1.1; Fixture Attachment Detail: This detail indicates the fixture attached to a wall. Is there a wall for all fixtures? Please verify and provide additional details as required. 3. Sheet A1.4; Restroom Elevation 3: Please provide dimensions to locate the vertical grab bar per the ICC/ANSI Figure 604.5.1. 4. Sheet A1.4; Mop Sink Elevations G and H: Please provide a structural calculation indicating the wall construction is capable of resisting the water heater weight. 5. General: Please provide written responses to all review comments. |
06/01/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
06/01/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
06/01/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/11/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
06/16/2020 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Passed | |
06/24/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |