Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T20CM03177
Parcel: 11612283A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM03177
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/26/2020 ALEXANDRA HINES ZONING REVIEW Reqs Change 1) Approval of DP20-0107 is required prior to approval of the building plans
05/26/2020 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change 1) Approval of DP20-0107 is required prior to approval of the building plans
05/26/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Why is only the 400 amp service metered? See one line diagram.
2. The new Feeders to the new disconnects are extensions of the service conductors to the new meters for the MRI Project. Grounding conductors ahead of the service disconnects to be sized per NEC 250.66.
3. Provide a grounding detail for the modified service arrangement and the 112KVA transformer..
4. How is the new MRI Mobile Trailer powered.
5. The load calculations show the MRI load at 312 amps. Is this fed from the 200 amp disconnect? Please clarify.
Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements
05/26/2020 MARTIN BROWN FIRE REVIEW Approved
05/26/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A-0; Code Review: Please indicate the square footage of the new mobile trailer. The SF and occupant load for this mobile trailer must be added to the total building SF and the total building occupant load, and indicated on the permit drawings.
05/27/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
05/27/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
05/27/2020 ROBERT SHERRY WATER REVIEW Completed
05/29/2020 ARUIZ1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review