Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T20CM03138
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/27/2020 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 05/29/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide primary and secondary roof scuppers for the building additions (a hole in a collector box is not a secondary scupper). Determine the minimum dimensions of the two scuppers per Section 1106.5, IPC 2018. Reference: Section 1108, IPC 2018. 2. If a secondary roof scupper is not associated with the existing scupper, provide a secondary scupper or structural calculations to show that the roof is capable of supporting the maximum depth of ponded water on the roof if the existing scupper is blocked. Reference: Section 1611.1, IBC 2018 and Section 1101.7, IPC 2018. |
| 05/29/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Section C502.1, International Energy Conservation Code 2018. 2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018. 3. Provide locking access port caps for the condensing units per Section 1101.10, IMC 2018 or locate the condensing unit in a controlled space. |
| 05/29/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 06/04/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 06/08/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please provide complete compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the exterior lighting. |
| 06/10/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: Leasing Office Addition T20CM03138 - Related DP20-0101 Building Plan (1st Review) TRANSMITTAL DATE: June 10, 2020 1. Zoning has reviewed the building plans for compliance with the submitted development package DP20-0101. While the building plans are consistent with the approved DP as it relates to the zoning review purview of the building footprint, building height, square footage, site conditions etc., zoning cannot approve the building plans until the DP has been approved and all PDSD Commercial Plans reviewers have approved the building plans. 2. The development package sheets provided within the building set must either be 1) the approved and stamped development package sheets, 2) stamped for reference only, or 3)removed from the building plan set. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 06/15/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | DP must be approved first. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/17/2020 | JGARCIA1 | APPROVAL SHELF | Passed |
| 07/17/2020 | JGARCIA1 | OUT TO CUSTOMER | Completed |
| 07/17/2020 | JGARCIA1 | REJECT SHELF | Completed |