Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T20CM03125
Parcel: 106070380

Address:
1010 W LIND ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM03125
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/21/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheets s1.0, s1.1, s1.2, s1.3, and s2.0: The professional design engineer in responsible charge must sign and date all drawings prepared by him/her per the IBC Section 107. Please provide.
2. Structural Calculation: The professional design engineer in responsible charge must sign and date all drawings prepared by him/her per the IBC Section 107. Please provide.
3. Mueller Inc. Shop Drawings: These drawings must follow the IBC Section 107.3.4.1 for deferred submittals. The calculations and drawings must be submitted to the registered design professional in responsible charge, who shall then forward them to the building official with a notation indicating the deferred submittal documents have been reviewed and found to be in general conformance to the building design.
4. General: Please provide a Special Inspection Certificate with Parts A and B completed. This form may be found at www.tucsonaz.gov/PDSD.
5. General: Please provide written responses to all review comments.
05/21/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
05/21/2020 MARTIN BROWN FIRE REVIEW Passed
06/09/2020 ELISA HAMBLIN ZONING REVIEW Reqs Change FROM: Elisa Hamblin, AICP
PDSD Zoning Review

PROJECT: T20CM03125; Shade Covering
Building Plans (1st Review)
1010 W Lind St

TRANSMITTAL DATE: June 9, 2020
DUE DATE: June 18, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review comments were addressed.
1. COMMENT: Zoning has reviewed the building plans but cannot approve them at this time. As a new structure (shade canopy) is proposed on site, a development package submittal is required. At a minimum the development package must show the site in question with relevant zoning information. A previously approved development package may be re-used with the changes illustrated, or a new development package may be created. Information on development package submittals can be found online here: https://www.tucsonaz.gov/pdsd/apply-permit#Development%20Package. The development package must be approved prior to approval of the building plans.
2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the approved development package.
3. COMMENT: Once the plans have been reviewed and approved by the Commercial Plan Reviewers and zoning has verified consistency with the approved development package, the building plans can be approved by zoning.

If you have any questions about this transmittal, please contact me at Elisa.Hamblin@tucsonaz.gov or (520) 837-4966.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: building plans and approved version of the DP as reference.
06/09/2020 EHAMBLI1 ENGINEERING REVIEW Reqs Change See Zoning Review comments. Development package required.