Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/26/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A-001: Please indicate on this sheet that the shelving (see Sheet A-102) may require a deferred submittal. Any shelving greater than 6' in height (including the stacked goods) up to 12' requires a detail on the drawings indicating the connection of the shelving to the floor. If the shelving (including the stacked goods) is over 12' in height, structural calculations are required along with details of the shelving. 2. Sheet A-100: Please indicate the Building Construction Type on this sheet, including whether sprinklered/non-sprinklered. 3. Sheet A-100; Egress Plan: Please indicate the Exit Access Travel Distances on the plan and verify those distances meet the requirements of the IBC Table 1017.2. 4. Sheet A-104; Reflected Ceiling Plan: The plan indicates one of the exits (at Door 104) at the exterior wall of the Back Room. Door 102 enters that Back Room. The Door/Hardware Schedule indicates Door 102 can be locked (Hardware Set 2). Per the IBC Section 1016.2(3), exit access shall not pass through a room that can be locked. Please verify. 5. Sheet A-301; Detail 28: At the top of the wall, a note indicates "Bracing As Required". The IBC Section 1607.15 indicates interior walls must have adequate strength and stiffness to resist a horizontal load of 5 PSF. Please call out bracing size, spacing, and connection to the wall and to the structure above, or provide structural calculations for the wall studs, indicating they have the strength and stiffness to resist that load. 6. General: Please provide north arrows to all plans. 7. General: Please provide written responses to all review comments. |
06/29/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/30/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/30/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. A relocated lavatory requires a replacement faucet that is a metering faucet. The specified replacement faucet meets the code requirements provided that it has an automatic time-out so that it will dispense a maximum of 0.25 gallons per metering cycle. Reference: Section 412.11, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. The submitted COMcheck Mechanical Compliance Certificate shows a 10-gallon storage-type water heater being installed. Coordinate the COMcheck mechanical systems list with the proposed plumbing installation. Reference: Section 107.2.1, IBC 2018. |
06/30/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | 2018 IFC, 105.4.2 Information on construction documents. Construction documents shall be drawn to scale on suitable material. Electronic media documents are allowed to be submitted where approved by the fire code official. Construction documents shall be of sufficient clarity to indicate, location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations as determined by the fire code official. 2018 IFC, 105.4.3 Applicant Responsibility. It shall be the responsibility of the applicant to ensure that construction documents include all of the fire protection requirements and the shop drawings are complete and in compliance with applicable codes and standards. Please advise if the building is sprinklered. |
06/30/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide calculations to verify that the specified outside air flow rate is adequate. Reference: Section 403.3.1.1, IMC 2018. 2. A balance report to verify adequate ventilation will be required prior to the final mechanical inspection. Reference: Section 403.3.1.5, IMC 2018 as amended by the City of Tucson. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/26/2020 | JGARCIA1 | APPROVAL SHELF | Completed |
08/26/2020 | JGARCIA1 | OUT TO CUSTOMER | Completed |