Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM02741
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/04/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 05/04/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide an air return for the office to avoid using the corridor as a return air duct. Reference: Section 601.2, IMC 2018 |
| 05/04/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide a service sink and drinking fountains per Table 2902.1, IBC 2018 and Section 410.3, IPC 2018. |
| 05/04/2020 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 05/04/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 05/05/2020 | ELISA HAMBLIN | ZONING | REVIEW | Approved | |
| 05/05/2020 | EHAMBLI1 | ENGINEERING | REVIEW | Passed | |
| 05/05/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet G1.00; General Building Requirements: The Occupancy Classification is listed as Mercantile (M). The IBC Section 309 indicates Mercantile as the use of a building for the display and sale of merchandise. The IBC Section 304 indicates Business (B) as the use of a building for office, professional, or service-type transactions. It would appear the B Occupancy Classification would be a better fit than the M Occupancy Classification. Please verify. 2. Sheet G1.00; General Building Requirements: Please revise the requirements as needed for the B Occupancy Classification, including Occupant Load and Plumbing Fixture requirements. 3. Sheet A1.00; Breakroom Elevation D: Per the IBC Section 1109.3, sinks in accessible areas are required to be accessible. The height of the counter/sink in the Breakroom is required to be a maximum of 2'-10" above finish floor. Please verify. 4. Sheet A1.00; Grab Bars: Please indicate an elevation (in addition to Elevation C) the restroom grab bars per the ICC/ANSI Figures 604.5.1 and 604.5.2. 5. General: Please provide written responses to all review comments. |
| 05/05/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |