Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T20CM02335
Parcel: 11720016H

Address:
100 S CHURCH AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM02335
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/21/2020 SAMUEL ROGERS ZONING REVIEW Reqs Change RNA review required for exterior facade work. When complete, contact me for an "over-the-counter" review or sign into our Virtual Service Counter online.
Elisa Hamblin
elisa.hamblin@tucsonaz.gov
04/21/2020 ROBERT SHERRY WATER REVIEW Completed
04/21/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please verify that there are maintenance receptacles and a lighting outlet where applicable for the mechanical equipment on the roof and for the Fan Coils. NEC 210.63, 210.70.A(3).
04/21/2020 SROGERS2 ENGINEERING REVIEW Passed
04/21/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A1.1; Egress Floor Plans: The maximum travel distance allowed to an exit indicates 300' for a B Occupancy, and 250' for an M Occupancy. The travel distances are not indicated on each floor plan. Please provide for all exit access paths.
2. Sheet D2.1; Demolition Plan Keynotes: Note 11 was not located on this plan. Please verify.
3. Sheets D2.1, D2.2, and D2.3; Demolition Plan Keynotes: Please indicate that not all notes are included on all floor plans.
4. Sheet A2.1; Floor Plan: A Keynote in the elevator references Note 4. Please revise.
5. Sheets A2.1, A2.2, and A2.3; Floor Plan Keynotes: Please indicate that not all notes are included on all floor plans.
6. Sheets A2.1, A2.2, and A2.3; Wall Types: Wall Type B references Details 2, 3, and 9 on Sheet A8.0. Please revise that reference.
7. Sheets A3.1, A3.2, and A3.3; RCP Plan Keynotes: Please indicate that not all notes are included on all RCP plans.
8. Sheets A3.1, A3.2, and A3.3; Reflected Ceiling Plans: Please indicate the exit lighting locations on the plans.
9. Sheet A5.0; North and East Elevations: A Section 7/A9.2 is cut through the sill of upper floor windows. Detail 7/A9.2 is cut at a sill at grade level. Please verify.
10. Sheet S4.0; Section 207: It appears Notes 1 and 2 are reversed. Please verify.
11. General: Please provide written responses to all review comments.:
04/21/2020 SROGERS2 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
06/02/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide ventilation calculations. Reference: Section 403.1, IMC 2018.
2. Explain how the exhaust fan, EF-1, is providing ventilation to the first and second floors. Reference: Section 107.2.1, IBC 2018.
3. How is ventilation being provided to the third floor? Reference: Section 107.2.1, IBC 2018.
4. Demonstrate energy code compliance for the alterations to the building envelope using calculations based on the current code. Reference: Sections C503.1 and C503.3, International Energy Conservation Code 2018.
06/02/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
06/18/2020 KROBLES1 FIRE REVIEW Needs Review