Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM02335
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/21/2020 | SAMUEL ROGERS | ZONING | REVIEW | Reqs Change | RNA review required for exterior facade work. When complete, contact me for an "over-the-counter" review or sign into our Virtual Service Counter online. Elisa Hamblin elisa.hamblin@tucsonaz.gov |
04/21/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
04/21/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please verify that there are maintenance receptacles and a lighting outlet where applicable for the mechanical equipment on the roof and for the Fan Coils. NEC 210.63, 210.70.A(3). |
04/21/2020 | SROGERS2 | ENGINEERING | REVIEW | Passed | |
04/21/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1.1; Egress Floor Plans: The maximum travel distance allowed to an exit indicates 300' for a B Occupancy, and 250' for an M Occupancy. The travel distances are not indicated on each floor plan. Please provide for all exit access paths. 2. Sheet D2.1; Demolition Plan Keynotes: Note 11 was not located on this plan. Please verify. 3. Sheets D2.1, D2.2, and D2.3; Demolition Plan Keynotes: Please indicate that not all notes are included on all floor plans. 4. Sheet A2.1; Floor Plan: A Keynote in the elevator references Note 4. Please revise. 5. Sheets A2.1, A2.2, and A2.3; Floor Plan Keynotes: Please indicate that not all notes are included on all floor plans. 6. Sheets A2.1, A2.2, and A2.3; Wall Types: Wall Type B references Details 2, 3, and 9 on Sheet A8.0. Please revise that reference. 7. Sheets A3.1, A3.2, and A3.3; RCP Plan Keynotes: Please indicate that not all notes are included on all RCP plans. 8. Sheets A3.1, A3.2, and A3.3; Reflected Ceiling Plans: Please indicate the exit lighting locations on the plans. 9. Sheet A5.0; North and East Elevations: A Section 7/A9.2 is cut through the sill of upper floor windows. Detail 7/A9.2 is cut at a sill at grade level. Please verify. 10. Sheet S4.0; Section 207: It appears Notes 1 and 2 are reversed. Please verify. 11. General: Please provide written responses to all review comments.: |
04/21/2020 | SROGERS2 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
06/02/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide ventilation calculations. Reference: Section 403.1, IMC 2018. 2. Explain how the exhaust fan, EF-1, is providing ventilation to the first and second floors. Reference: Section 107.2.1, IBC 2018. 3. How is ventilation being provided to the third floor? Reference: Section 107.2.1, IBC 2018. 4. Demonstrate energy code compliance for the alterations to the building envelope using calculations based on the current code. Reference: Sections C503.1 and C503.3, International Energy Conservation Code 2018. |
06/02/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
06/18/2020 | KROBLES1 | FIRE | REVIEW | Needs Review |