Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM02242
Parcel: 13705494G

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T20CM02242
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/11/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
01/12/2021 NICHOLAS ROSS ZONING REVIEW Approved
12/03/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Overflow scuppers must have the same capacity as the primary scuppers. Reference: 1106.5 and 1108.3, IPC 2018. [Initial comment: Provide secondary (overflow) roof drainage. Reference: Sections 1108.1, 1108.2 and 1108.3, IPC 2018.]
2. Southwest Gas, the local gas utility, only provides natural gas at 7" WG, 2 PSIG, and 5 PSIG. Appliances needing gas service at 7" WG or greater will require a gas meter that delivers at least 2 PSIG gas into a regulator located after the meter set. Reference: Section 402.1, IFGC 2018. [Initial comment: The gas schematic on sheet P2.2 shows the branch pipe for the 4-burner hot plate (53, 120 CFH) as ¾". At a developed length of 125-feet, a 1" branch pipe is required. Reference: Table 402.4 (2), IFGC 2018.]
12/03/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change The make-up air unit piping detail shows a sump drain configuration, not a water recirculation detail. The detail also includes a cross-connection of the water supply and the sump drain. [Initial comment: Verify that the evaporative cooling section of the makeup air unit is equipped with a recirculating water system. Reference: Section 928.2, IMC 2018 and ARS Title 45, Chapter 1, Article 12. See text at: (http://www.azleg.gov/viewdocument/?docName=http://www.azleg.gov/ars/45/00313.htm).]
12/23/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
01/13/2021 JGARCIA1 APPROVAL SHELF Completed
01/13/2021 JGARCIA1 OUT TO CUSTOMER Completed
01/13/2021 JGARCIA1 REJECT SHELF Completed