Permit Number: T20CM02126
Parcel: 117071920

Address:
702 S 6TH AV

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T20CM02126
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/16/2020 MARTIN BROWN FIRE REVIEW Approved
04/21/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide the civil plans showing the installation of the water service to the building and the installation of the building sewer as part of the building plan set (i.e. not for reference only). Reference: Sections 104.2 and 107.2.1, IBC 2018.
2. Correct the note in detail 4/P2.1 that mistakenly refers to WH1 instead of WH2.
3. Correct the note in detail 2/P2.1 that mistakenly refers to the detail for WH1being located on P2.1 instead of P3.1.
4. Clarify the CW & HW riser diagram 4/P2.1with regard to the water supply to P-1 and P-5.
5. Provide specifications for the floor drain, FD-1. Reference: Sections 303.4 and 402, IPC 2018.
6. Provide third-party listing and material standards for all plumbing fixtures being provided by others. Reference: Sections 303.4 and 402, IPC 2018.
7. An approved 2-way cleanout fitting is only allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow. Reference: Section 708.1.8, IPC 2018.
8. Provide a cleanout at the junction of the building drain and the building sewer. Reference: Section 708.1.3, IPC 2018.
9. The rim elevation of the next upstream sanitary manhole (#9864-23, 2404.92') is higher than the first floor elevation (2403.00'). Provide a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson. Verify that no fixtures located above the rim elevation of the next upstream manhole (i.e. the 2nd and 3rd floors) discharge through the backwater valve.
10. Provide a cleanout in the building sewer prior to entering the right-of-way. Reference: Pima County Standard Detail RWRD 401, 2015.
11. Clarify the terminations for the 3" roof drain sewers. Reference: Section 1101.2, IPC 2018.
12. Provide overflow protection for the roof of the single-story building. Reference: Sections 1101, 1106 and 1108, IPC 2018.
04/21/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
04/21/2020 ROBERT SHERRY WATER REVIEW Completed
05/01/2020 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. DP19-0315 must be approved first.
05/07/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Ref; Plan Sheet E0.2. The electrical service detail shows the GEC for the UFER only. Provide details for Water, Gas, Bld. Steel, bonding where applicable per NEC 250.104.
2. It appears that the electrical service design shows an overhead fed service by the utility. Provide for an underground fed service as required per 2018 IBC Amendments section 112.1.1, or appeal for an underground service waiver.
3. Revise the project address on the electrical plans to the correct address.
Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements,
05/08/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Section Manager

PROJECT: T20CM02126 - New Office Building
702 S. 6th Avenue/ C-3 Zoning

TRANSMITTAL DATE: May 8, 2020

DUE DATE: May 11, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Until DP19-0315 is approved the building plans cannot be approved.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
05/11/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet G2.2; Levels 1 and 2 Floor Plans: Per the IBC Section 1017.3, the exit access travel distance shall be measured from the most remote point of each room/area along the natural and unobstructed path of horizontal and vertical egress travel to the exit. Please revise.
2. Sheet A1.1.3; Reflected Ceiling Plan: Please indicate the exit sign locations on this plan, or provide a reference note with that information.
3. Sheet A1.2.3; Reflected Ceiling Plan: Please indicate the exit sign locations on this plan, or provide a reference note with that information.
4. Sheet A2.1; Roof Plan (Keynote 7.12): Please indicate a ladder detail on this sheet, or reference specifications for the ladder on Sheet A2.2 (Detail 5).
5. Sheet A2.1; Roof Plan: Please provide the grid lines on this plan.
6. Sheet A4.4; Wall Section 1: At the Level 2 elevation and the level 1 ceiling, two keynotes are incomplete. Please revise.
7. Sheet A4.4; Wall Section 2: The detail reference at the left of the stair indicates 5/A6.3. Should this reference be indicated as "Similar"? Please verify.
8. Sheet A4.4; Wall Section 3: The detail reference at the Level 2 indicates 2/A6.4. Should this reference be indicated as "Similar"? Please verify.
9. General: Please provide a Special Inspection Certificate with Parts A and B completed. You may find this at www.tucsonaz.gov/PDSD.
10. General: Please provide written responses to all review comments.

Final Status

Task End Date Reviewer's Name Type of Review Description
06/23/2020 KROBLES1 OUT TO CUSTOMER Completed