Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/02/2020 | DJELLEN1 | ZONING | REVIEW | Approved | |
04/02/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide a copy of the last approved certificate of occupancy. |
04/02/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
04/02/2020 | DJELLEN1 | ENGINEERING | REVIEW | Passed | |
04/02/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet TS.1; Project Code Check: Please revise the Construction Type to VB. 2. Sheet TS.1; Project Code Check: The Exiting indicates one exit required and one exit provided. The plan indicates two exits. Please verify. 3. Sheet TS.1; Project Code Check: The Drinking Fountain requirement indicates a point of use dispenser called out in plans. That call out was not located on the Floor Plan. Please verify. 4. Sheet A.1; Floor Plan Keynotes: Please indicate the new metal stud spacing in Note 19. 5. Sheet A.1; Floor Plan Keynotes: Please provide an elevation of the new sales counter in Note 5, indicating accessibility meets the requirements of the ICC/ANSI Section 904. 6. Sheet A.1; Floor Plan Keynotes: Note 8 was not located on the plan. Please verify. 7. Sheet A.1; Floor Plan Keynotes: Notes 4 and 9 must indicate if the new walls extend to the roof deck or just above the ceiling. If just above the ceiling, indicate the bracing size, spacing, and connection to the roof and to the new partition. 8. General: Please provide written responses to all review comments. |
04/02/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
04/02/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
04/02/2020 | MARTIN BROWN | FIRE | REVIEW | Approved | |
04/09/2020 | ARUIZ1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |