Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T20CM01763
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/09/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide overflow protection for the roofs. The "overflow" in the scupper collector box does not qualify as overflow protection. See Section 1108, IPC 2018. [Initial comment: Provide roof drainage calculations and plans for the new roofs. Provide overflow protection for the roofs. Reference: Sections 1101, 1106 and 1108, IPC 2018.] |
| 06/09/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Provide information regarding the sq feet of the apparatus bay. Please show on the plans the sq ft of the bay and actual R3 sq ft. Or explain why fire sprinklers were removed please. |
| 06/09/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The manufacturer's installation instructions limit the combustible materials within 12" of the rear of the stove. The area behind the stove appears to be furred-in using wood studs. See exception 1 to Section 507.2.6, IMC 2018 for non-combustible construction. [Initial comment: Provide the specifications for the proposed gas-fired range. Verify that it is coordinated with the proposed range hood. Reference: Section 107.2.1, IBC 2018.] 2. The COMcheck Envelope Compliance Certificate calls for R-38 roof insulation entirely above the roof deck but sheet A2.3 states that the new R1 roof types use R-38 batt insulation. Coordinate the drawings and COMcheck. [Initial comment: Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Sections C103.2, C303, and C502.1, International Energy Conservation Code 2018.] |
| 06/17/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: Fire Station #11 - Expansion & Remodel T20CM01763 Building Plan (2nd Review) TRANSMITTAL DATE: June 17, 2020 1. Zoning has reviewed the building plans for compliance with the approved development package DP19-0115. While the building plans are consistent with the approved DP as it relates to the zoning review purview of the building footprint, building height, square footage, site conditions etc., zoning cannot approve the building plans until PDSD Commercial Plans reviewers have approved the building plans. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 06/17/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Previous Comment 12; General Structural Notes: Sheet S1.2 is still included in this submittal set. The comment response indicated S1.2 was removed. Please verify. 2. Previous Comment 13; Special Inspection Certificate: This certificate with Parts A and B completed is required with the plan review. Please provide. 3. General: Please provide written responses to all review comments. |