Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM01763
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/08/2020 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Under building area calculations on sheet A 0.1, box is checked indicating building will be sprinklered. Please revise to the correct box. |
| 04/10/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that the distance from the hot water source to the hot water termination for the new public lavatories complies with the requirements of Section C404.5, IECC 2018. 2. Provide roof drainage calculations and plans for the new roofs. Provide overflow protection for the roofs. Reference: Sections 1101, 1106 and 1108, IPC 2018. |
| 04/10/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. The 2018 International Mechanical Code with Local Amendments is the relevant code for this project (see the natural ventilation note at the dorm rooms). 2. Provide the specifications for the proposed gas-fired range. Verify that it is coordinated with the proposed range hood. Reference: Section 107.2.1, IBC 2018. 3. Provide an exhaust duct for the proposed clothes washer/dryer. Reference: Section 504.8.6, IMC 2018. 4. Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. Reference: Sections C103.2, C303, and C502.1, International Energy Conservation Code 2018. |
| 04/10/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 04/24/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A0.1; Building Code Summary: A note under "Separated Occupancies" indicates two hour rated fire partitions will be required between R-3 and S-2 occupancies per the IBC Table 508.4. That table indicates a one hour rating if the building has automatic sprinklers. Please verify. 2. Sheet A0.1; Building Code Summary: The "Building Area Calculations" indicate a sprinklered building, while the "Allowable Area" indicates non sprinkler for R3 and S2. Please verify and revise as required. 3. Sheet A0.1; Building Code Summary: Under "Additional Fire Resistive Ratings", the corridors and separated occupancies both indicate "non sprinklered". Please verify. 4. Sheet A0.1; Building Code Summary: The "Means of Egress" references the IBC Section 1016.2 for exit travel distances. Please revise that reference to the IBC Table 1017.2. 5. Sheet A0.1; Building Code Summary: The maximum exit travel distances shown are based on non sprinklered buildings. Please verify. 6. Sheet A0.1; Building Code Summary: "Plumbing Fixture Calculations" indicate one required drinking fountain. Please revise that per the IBC Section 1109.5.1 to a high/low drinking fountain. 7. Sheet A0.1; Governing Regulations: For City, State, and Federal government facilities, the 2010 ADAAG accessibility code is used. Please revise. 8. Sheet A2.0: Please indicate on this sheet to see Sheet A2.2 for Wall Types. 9. Sheet A2.0; Floor Plan: At the east wall of Hallway 109 (just north of Toilet 110), a detail is unfinished. Please revise. 10. Sheet A2.2; Wall Types; Detail 7: The Wall Types indicate "all interior walls shall be Type P1 (fire resistance rated) unless noted otherwise. If the typical wall is rated, it must continue to the roof deck (see Wall Type Notes C). Please verify and revise as required. 11. Sheet A5.0; Interior Elevation Keynotes: Note 2 references Sheet A5.2 for mounting heights. Please revise that sheet reference. 12. Sheet S1.2; General Structural Notes: Are the same notes for Shop Drawings, Deferred Submittals, and Special Inspections on both Sheets S1.1 and S1.2? Please verify. 13. General: Please provide a Special Inspection Certificate with Parts A and B completed. 14. General: Please provide written responses to all review comments. |
| 04/24/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 04/28/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 04/28/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: Fire Station #11 - Expansion & Remodel T20CM01763 Building Plan (1st Review) TRANSMITTAL DATE: April 28, 2020 1. Zoning has reviewed the building plans for compliance with the approved development package DP19-0115. While the building plans are consistent with the approved DP as it relates to the zoning review purview of the building footprint, building height, square footage, site conditions etc., zoning cannot approve the building plans until PDSD Commercial Plans reviewers have approved the building plans. 2. The development package sheets provided within the building set must either be 1) the approved and stamped development package sheets, 2) stamped for reference only, or 3)removed from the building plan set. 3. Development Package DP19-0115 must be issued prior to issuing the building plan set. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |