Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM01715
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/16/2020 | DJELLEN1 | ZONING | REVIEW | Approved | |
| 03/16/2020 | DJELLEN1 | ENGINEERING | REVIEW | Passed | |
| 03/16/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 03/16/2020 | RMCCOY1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Provide description of showers (608.2.1) and locations of grab bars . IBC107.2.1. |
| 03/16/2020 | RMCCOY1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 03/19/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Show the size, route, and termination of the dryer exhaust duct. Reference: Sections 504.1, 504.2, 504.4 and, 504.6, IMC 2018. |
| 03/19/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Correct note #2 for the gas diagram; the correct gas table is Table 402.4 (2), not Table 402.4 (28) unless you want to use propane. Reference: Section 402.3, IFGC 2018. 2. Revise the design of the hot water supply to the restroom lavatories so that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. 3. Provide structural calculations for the mounting shelf for the water heater to show that the water heater will be safely supported from the building structure. Reference: Section 301.2, IPC 2018. |
| 03/19/2020 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Verify the size of the existing water meter serving this address and the projected total demand that the meter will serve. Reference: Section 107.2.1, IBC 2018. |
| 04/01/2020 | MARTIN BROWN | FIRE | REVIEW | Approved |