Permit Review Detail
Review Status: Completed
Review Details: WALK THRU - COMM
Permit Number - T20CM01527
Review Name: WALK THRU - COMM
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/09/2020 | RMCCOY1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Provide structural calculations for roof mounted HVAC. Respond to plan review comments in writing |
03/09/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan recommends. Also provide a written response. 1. Provide a complete panel schedule including load calcs for all equipment including the RTU. 2. Is the bathroom exhaust fan new? If so, provide sequence of operation or control. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
03/09/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the presence of two condensing units with their refrigerant lines connecting to a single fan-coil unit. 2. Show that the water heater can be removed from the closet without removing the furnace. 3. A note calls for the existing condensate drain to be used for what appears to be the temperature & pressure relief line from the waater heater. Where is the new condensate drain line? 4. Provide the total gas load and deveploped pipe length for the new gas service. Show the existing pipe sizes and the system pipe configuration. 5. Show the size and type of combustion/relief venting for the furnace closet. 6. Show the size, configuration, and termination of the vent for the water heater and furnace. 7. How is the apartment ventilated? 8. Verify that the gas furnace meets the required thermal efficiency requirements. |