Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM01517
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/05/2020 | LSHAMIS1 | ZONING | REVIEW | Approved | |
03/05/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide ventilation calculations. 2. Provide balancing data for the HVAC systems. |
03/05/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Assign branch circuit numbers and panels for all new equipment including power drops on the electrical floor plan. Also identify new and or existing electrical devices or equipment. 2. Provide complete panel schedules including load calcs. 3. Provide a complete electrical lighting plan, luminaire schedule, 2018 IECC energy calcs if applicable. Ref; 2018 IBC 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal requirements, 2012 Tucson/Pima County Outdoor Lighting Code. |
03/05/2020 | MARTIN BROWN | FIRE | REVIEW | Approved | |
03/05/2020 | RMCCOY1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. The City of Tucson has adopted the 2018 IBC , amend plans. IBC 107.2 2. Provide complete code analysis for projecy . IBC 107.2. 3. Provide compliance with IBC Chapter 29 . IBC 29. |
03/05/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
03/05/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide complete plumbing drawings showing that the plumbing in the modified restrooms comply with the current plumbing and energy codes. 2. Provide specifications for all new plumbing fixtures. |
03/13/2020 | PMARTIN1 | ENGINEERING | REVIEW | Needs Review | |
03/13/2020 | PMARTIN1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |