Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T20CM01383
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/05/2020 | IMONSHI1 | ZONING | REVIEW | Reqs Change | FROM: Iman Monshizadeh PDSD Zoning Review Section PROJECT: T20CM01383 New SFR (1st Review) 2332 E 8th TRANSMITTAL DATE: March 5th, 2020 DUE DATE: March 16th, 2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: The setbacks for the north and east of the property do not meet the minimum requirements per the UDC Table 6.3-2.A. if the proposed setbacks are to be kept, a design development option is required. Design development option packet: https://www.tucsonaz.gov/files/pdsd/2019_DDO_for_Setback_and_Height_UDC.pdf 02. COMMENT: wall heights for setbacks are measured from grade to TOW, revise the wall heights on the next submittal. If you have any questions about this transmittal, Contact Iman Monshizadeh at (520) 837-4082 or by email Iman.monshizadeh@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans |
03/05/2020 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T20CM01383 COMMENTS BEFORE REVIEW: 1. A dwelling unit providing complete independent living facilities requires compliance with design ordinances for handicap provisions, solar water, photo-voltaic and gray water preparations. Design Ordinances adopted by the City of Tucson. 2. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc. 3. All SFR and Duplex plans submitted after March 1, 2009 require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½"control conduit and two ¾" copper piping for water with rooftop termination; straight 3" capped sleeve; or an accessible attic (clear path 30" wide x 30" high) over the water heater. Show appropriate notation. 4. All SFR and Duplex plans submitted after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 . Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. 5. All construction drawings submitted after June 1, 2010 for one- or two-family dwellings must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. Include two clothes washer standpipes at an exterior wall, one with an above grade stub-out, and one plumbed to the building drain. If you have any questions please contact: Ken Van Karsen (520) 837-4912 City of Tucson Residential Plan Review |
03/26/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
03/31/2020 | MARTIN BROWN | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/14/2020 | JGARCIA1 | APPROVAL SHELF | Completed |
12/14/2020 | JGARCIA1 | OUT TO CUSTOMER | Completed |
12/14/2020 | JGARCIA1 | REJECT SHELF | Completed |