Permit Number: T20CM00932
Parcel: 13313007B

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T20CM00932
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/25/2020 MARTIN BROWN FIRE REVIEW Approved
02/27/2020 DAVID RIVERA ZONING REVIEW Reqs Change FROM: David Rivera
PDSD Zoning Review Section

PROJECT: T20CM00932 - (Religious Use)
Parking Lot Solar Canopies (1st Review)
7777 E. Speedway Boulevard - RX-1 Zoning

TRANSMITTAL DATE: February 27, 2020

DUE DATE: March 12, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


01. COMMENT: - Per UDC Article 6.6.3.B Specifically Within Residential Zones, Detached accessory buildings are not permitted in the buildable area extending the full width of the lot between the principal building and the front street lot line, except for terraces and steps not over three feet high above the natural grade, paved areas, and fences or walls. A Board of Adjustment for Variance will need to be approved prior to approval of the development package.


02. COMMENT: Revise the site plan to match what has been submitted in the Development Package. Once the DP is approved and the building plan documents are consistent with the DP zoning can approve the solar canopy application.


03. COMMENT: Zoning will review the building plans on the next submittal and compare the plans to the approved DP for consistency.





If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans
03/09/2020 RMCCOY1 BUILDING-COMMERCIAL REVIEW Approved
03/12/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan recommends. Also provide a written response.
1. Ref; East Service. Line diagrams. Per NEC 230.95, the Main breaker in the existing service equipment is required to be equipped with Ground Fault detection for the protection of the electrical equipment. This is not addressed or shown in the line diagrams. Please verify. If there is Ground Fault Protection, then the PV Interconnection cannot be at the load side of the service equipment unless it meets the requirements of NEC 705.32.
Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/25/2020 PMARTIN1 OUT TO CUSTOMER Completed