Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM00826
Parcel: 117200270

Address:
260 S CHURCH AV

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T20CM00826
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/24/2020 MROSS2 FIRE REVIEW Reqs Change Provide site plan.
Correct Deferred Submittals note on page g1.0 listing Fire Department submital of -
"1. Precast concrete structure"

Deferred submittals to Tucson Fire Department will include:
Fire Sprinkler
Fire Alarm System (water flow monitoring)
Fire service underground
04/03/2020 NROSS1 DESIGN PROFESSIONAL REVIEW Approved
04/07/2020 DJELLEN1 ZONING REVIEW Approved FROM: David Jellen
PDSD Zoning Review Section

PROJECT: T20CM00826 - New Parking Garage
Building Plan Review (1st Review) Tucson Convention Center / Relate to DP19-0312
260 S Church Ave / PAD-5 Zoning

TRANSMITTAL DATE: February 27, 2020

DUE DATE: March 6, 2020

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. COMMENT: Add the associated DP case number adjacent to the title block of each page, DP19-0312.


2. COMMENT: Show the location of the proposed parking garage relative to the rest of the site so that Zoning can confirm that the location is consistent with what is provided on the associated Development Package.


3. COMMENT: Provide the overall height of the elevator on the building section sheets (a4.0 and a5.1).


4. COMMENT: Zoning has reviewed the building plans for compliance with the unapproved Development Package. While the building plans are consistent with the unapproved DP19-0312 as it relates to the zoning review purview of the Building footprint, Height, square footage, site conditions etc., Zoning cannot approve the building plans until the PDSD Commercial Plans reviewers have approved the building plans and until the Development Package has been approved.


5. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the Development Package.


6. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the approved DP, the building plans can be approved by zoning.


If you have any questions about this transmittal, Contact David Jellen at (520) 837-4082 or by email David.Jellen@tucsonaz.gov or contact Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov
04/07/2020 PCAMARE1 ENGINEERING REVIEW Approved DP must be approved first.
04/09/2020 PIMA COUNTY ELECTRICAL-COMMERCIAL REVIEW Completed
04/09/2020 PIMA COUNTY PLUMBING-COMMERCIAL REVIEW Completed
04/09/2020 PIMA COUNTY BUILDING-COMMERCIAL REVIEW Completed
04/09/2020 PIMA COUNTY WATER REVIEW Completed
04/09/2020 PIMA COUNTY MECHANICAL-COMMERCIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
04/15/2020 LBOWERS1 OUT TO CUSTOMER Completed
04/15/2020 LBOWERS1 REJECT SHELF Completed