Permit Number: T20CM00795
Parcel: 13331159Z

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM00795
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/11/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A1.0; Floor Plan Keynotes: Note 3 indicates a drinking fountain at 34" above finish floor. Per the IBC Section 1109.5.1, one drinking fountain must meet requirements for a person in a wheelchair, and one drinking fountain must meet requirements for standing persons. Please indicate those requirements in Note 3, and verify on the drawings/specifications that those requirements are indicated.
2. Sheet A1.0; Floor Plan: Please add a note on this sheet to reference Sheet A1.1 for the Door Schedule.
3. Sheet A1.1; ADA Restroom Floor Plan: Please indicate the vertical grab bar on this plan.
4. Sheet S1.0; General Structural Notes (Design Criteria): Please indicate N/A on the Snow Design.
5. Sheet S2.0 (Partial Foundation Plan); Structural Calculations (Sheet 9): The calculations indicate a 5x5x3/8 angle at the column for the 3'-6" opening, while the Column Schedule for the Foundation Plan indicates Column C3 as a 4x4x5/16 angle. Please clarify.
6. Sheet S4.0 (Detail 201); Structural Calculations (Sheet 3): The calculations indicate a 3/8" bent plate lintel for a 3'-6" opening, while Detail 201 indicates a 1/4" bent steel plate (Note 3). Please clarify.
7. General: Please provide a Sprcial Inspection Certificate with Parts A and B completed. You can find this at www.tucsonaz.gov/PDSD.
8. General: Please provide written responses to all review comments.
02/11/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
02/12/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
02/12/2020 NMARTEL1 ZONING REVIEW Approved
02/12/2020 ROBERT SHERRY WATER REVIEW Completed
02/12/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
03/09/2020 MARTIN BROWN FIRE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
04/08/2020 ARUIZ1 APPROVAL SHELF Completed
04/08/2020 ARUIZ1 OUT TO CUSTOMER Completed
04/08/2020 ARUIZ1 REJECT SHELF Completed