Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T20CM00651
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/06/2020 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/02/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide a grounding detail for the racking and module grounding that shows compliance with NEC art 690.40. 2. Show the conduit routing including junction boxes and panels from the arrays on the roof to the area of the PV interconnection. Ref; 2018 IBC 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal requirements. |
| 03/02/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet T-1; Sheet Catalog: The Sheet Catalog indicates a Sheet SS-1 that is not included in this set of drawings, and does not list a Sheet G-1 which is included in this set of drawings. Please clarify. 2. Sheet M-1; Mounting Detail Roof Plan: The 2018 IFC Section 1204.3.1 indicates there shall be a minimum six foot wide clear perimeter around the edges of the roof (or four foot wide if Exception criteria is met). This plan does not indicate that criteria is met. Please verify. 3. Sheet M-1; Mounting Detail Roof Plan: The 2018 IFC Section 1204.3.2 indicates interior pathways between array sections shall meet certain requirements. This plan does not indicate that criteria is met. Please verify. 4. Sheet M-1; Mounting Detail Roof Plan: Please provide details and specifications of the aluminum rails indicated on this sheet. Include rail heights, intermediate rails, and connections of those rails to the roof structure. In addition, provide structural calculations indicating loads (IBC Section 1607.8) on those rails are adequately resisted by the rails and their connections. 5. Structural Calculations; Page 3 of 4: The determination for the adequacy of the existing roof structure may be changed due to the Comments 2 and 3. Please verify. 6. General: Please provide written responses to all review comments. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/04/2020 | JWILLIA2 | OUT TO CUSTOMER | Completed |