Permit Number: T20CM00514
Parcel: 13711429H

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM00514
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/23/2020 DJELLEN1 ZONING REVIEW Approved
01/23/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Show that the hood installation complies with Section 507.2.6, IMC 2018 with regard to a smooth, cleanable, non-absorbent, and non-combustible material installed between the hood and the wall, and extending 18" beyond the hood.
2. The hood exhaust 1s 1952 CFM, the make up air unit supplies 1542 CFM, and the AC unit will provide 240 CFM. From where will the additional 170 CFM of outside air be obtained? Reference: Section 508.1 IMC 2018.
01/23/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. The panel schedule for 'B' shows 2 EF-1's. Please clarify.
2. Verify that there is a GFI protected maintenance receptacle on the roof. NEC 210.63.
Ref; 2018 IBC 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal requirements, 2012 Tucson/Pima County Outdoor Lighting Code.
01/23/2020 DJELLEN1 ENGINEERING REVIEW Passed
01/23/2020 RMCCOY1 BUILDING-COMMERCIAL REVIEW Reqs Change 1. Please the type of construction for the building as Type VA or VB construction. IBC 602.1.
2. Provide framing details and anchor to floor for 1/2 wall. IBC 107.2.1.
3. Please verify and locate the portion of counter reserved for ADA point of sale service counter; provide front elevation of new counter. IBC 1109.12.3
4. Provide structural calculations for the support of the roof/ceiling and wall supporting the new hood and equipment. IBC 107.2.1.
01/23/2020 ROBERT SHERRY WATER REVIEW Completed
01/23/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
01/23/2020 RMCCOY1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
01/27/2020 MARTIN BROWN FIRE REVIEW Approved