Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T20CM00489
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/26/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
11/09/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | . |
11/09/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
11/09/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the boiler detail, 205, to show the gas cock located upstream of the dirt leg. Reference: Section 408.4, IFGC 2018. 2. Sheet P1.0 shows the boiler drain discharging to grade. The boiler drain shall discharge to the sanitary drain. Provide a means of cooling the drainage to a temperature within the temperature rating of the drainage pipe material. Reference: Section 702.5, IPC 2018. 3. Verify that the plate and frame heat exchanger has double-wall construction to prevent toxic water treatments in the boiler from contaminating the domestic hot water system. 4. The plate and frame heat exchanger schedule refers to the cold side as being from a tower. Should the cold side be the storage tank? 5. Clarify the boiler room schematic, specifically the line labeled "cold out" at the heat exchanger. |
11/23/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Passed | |
11/27/2020 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
12/02/2020 | STEVE SHIELDS | ZONING | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/24/2021 | PCAMARE1 | APPROVAL SHELF | Completed |
02/24/2021 | PCAMARE1 | OUT TO CUSTOMER | Completed |