Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM00489
Parcel: 13014009D

Address:
4380 E 22ND ST

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T20CM00489
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/26/2020 JPEELDA1 FIRE REVIEW Approved
11/09/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed .
11/09/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
11/09/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Revise the boiler detail, 205, to show the gas cock located upstream of the dirt leg. Reference: Section 408.4, IFGC 2018.
2. Sheet P1.0 shows the boiler drain discharging to grade. The boiler drain shall discharge to the sanitary drain. Provide a means of cooling the drainage to a temperature within the temperature rating of the drainage pipe material. Reference: Section 702.5, IPC 2018.
3. Verify that the plate and frame heat exchanger has double-wall construction to prevent toxic water treatments in the boiler from contaminating the domestic hot water system.
4. The plate and frame heat exchanger schedule refers to the cold side as being from a tower. Should the cold side be the storage tank?
5. Clarify the boiler room schematic, specifically the line labeled "cold out" at the heat exchanger.
11/23/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Passed
11/27/2020 SBLOOD1 ENGINEERING REVIEW Passed
12/02/2020 STEVE SHIELDS ZONING REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
02/24/2021 PCAMARE1 APPROVAL SHELF Completed
02/24/2021 PCAMARE1 OUT TO CUSTOMER Completed