Permit Number: T20CM00486
Parcel: 11720016G

Address:
108 S CHURCH AV

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T20CM00486
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/05/2021 MGAYOSS1 DESIGN PROFESSIONAL REVIEW Approved DATE: January 4, 2020 – Design Review CD Delta Revision 3
TO: Nick Ross, Lead Planner
City of Tucson
FROM: Rick Gonzalez, Architect (#26992)
COT On-Call Design Professional
RE: CD Review Delta 3, The Flin ,
T.I. Flin House and Stables, T20CM00486
I have reviewed the Cano Drug/Hop Lee Laundry Rehab Construction
Documents, Delta 3 Revision submitted December 2020 for the purpose of
determining its conformance with design requirements based upon Unified
development Code (UDC) Section 5.12 IID (Downtown Core Sub-District DCS);
and Rio Nuevo Area (RNA), of the required plans and documents submitted to
PDSD.
Submittal Requirements Status
1. Streetscape Design:
pedestrian orientation: Complies
Architectural elements/details at the 1st two
levels – ground floor windows – 50% of frontage, single N/A existing
facade plane 50' max with no architectural detail. ID historic structure
front doors – graphics, lighting, or similar. Commercial
or retail at 1st floor. Sidewalks – maintain with safe
widths to adjoining properties with outdoor seating,
dining, landscape, if existing maintain bus pull-outs,
and safe drive-throughs.
2. Shade: Complies
50% of sidewalk areas on Summer Solstice, use trees,
arcades, canopies, shade structures historically
compatible with context except where not feasible.
3. Development Transition Standards: Complies
mitigate noise, odor, vibration relative to residential uses
nearby. Maximum height 25-30' and 30' from property Bulk standards are not
lines. Reduce bulk relative to residential, breaking mass, applicable to this
projected windows at 2nd level to reduce views into
residential areas. Balconies to orient away or screen from
residential areas. Buffer and screen from single family
or duplex residential with landscaping, walls, decorative
features or other 'best practices'. Orient service areas away
from residential with mitigation methods described above,
same with parking areas. Best Practice Alternatives may be
offered for compliance. Provide site utility layouts... Utility layouts provided
4. Rio Nuevo Design Standards Complies
Ina addition to the above design standards avoid heat and
glare, provide bike parking to avoid conflicts with
pedestrians. Colors chosen should be compatible with
surrounding context. Same with use of materials, patterns,
in the Downtown area. Provide 24 hour street level activity
using retail, office, residential uses. Public access from
level... residential access may be elevated or from parking
areas.
5. Site Parking: Complies
minimum 6' paths, vehicle points of ingress/egress.
Keep employee parking remote for patron easy access.
5% of gross area – plaza courtyards, patios for outdoor
multi-use and gathering where possible. Site parking to
be on-site or within ¼ mile.
6. Downtown Core Subdistrict (DCS): Complies
Maximum building height – 60, drought-tolerant
landscaping, bike parking required. Solid waste collection
alternatives provided.
General Comments:
Based on CD Revision Delta 3 of the Cano Drug/Hop Lee Laundry Rehab Plan Set, I
recommend approval relative to the comment below:
Comment: 1. The revision is for mechanical and electrical plan changes within screened and enclosed
areas and therefore is recommended for approval in regard to IID Design Review compliance.
Regards,
Rick Gonzalez, Architect
COT Design Professional
01/27/2021 JBROWN2 HISTORIC REVIEW Approved Historic staff has reviewed the limited plan set submitted. Elevations are missing from the set. Please provide elevations consistent with the Historic approval.
02/05/2021 STEVE SHIELDS ZONING REVIEW Approved Until approved by Historic & Design Professional Zoning cannot approve the revisionl.
02/05/2021 STEVE SHIELDS ZONING REVIEW Approved Plans have been approved by Historic and Design Professional. Zoning can approve.
12/21/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
12/21/2020 PC_CANDERS1 BUILDING-COMMERCIAL REVIEW Completed
12/21/2020 ROBERT SHERRY WATER REVIEW Completed
12/21/2020 JVINCEN1 FIRE REVIEW Approved
12/21/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
12/21/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
02/26/2021 IMONSHI1 OUT TO CUSTOMER Completed