Permit Number: T20CM00481
Parcel: 137051000

Address:
5065 S 12TH AV

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T20CM00481
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/12/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. It does not appear any changes that were requested in the 1/27/20 review were made in the new submittal drawings. Please verify.
03/16/2020 DJELLEN1 ZONING REVIEW Approved
03/20/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Comment not addressed. [Initial comment: Revise the site plan to show the property lines and the distance of the building walls from the property lines. Reference: Section 107.2.6, IBC 2018.]
2. Comment not addressed. [Initial comment: Show how the proposed termination of the Type I exhaust duct and exhaust fan complies with requirements of Sections 506.3.13.2 and 506.3.13.3, IMC 2018.]
03/20/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Detail not revised. [Initial comment: Revise detail 208 to indicate that the distance from the hot water source to the hot water termination for the public lavatories must comply with the requirements of Section C404.5, IECC 2018.]
2. Comment not addressed. Details 206 and 216 still indicate an 18" high platform for the water heater, the plumbing plans still show the water heater mounted over the mop sink (although neither the plumbing water plan nor the water isometric, B/P3, show any water supply to the mop sink), and detail 2/A3 shows a "typical water heater support" of undetermined height or capacity. [Initial comment: The specified water heater has a weight of approximately 990 pounds when full. Detail 206 shows it mounted in an 18"-high platform but the plumbing water floor plan shows it mounted above the mop sink. Clarify how the water heater is mounted and, if it is mounted above the mop sink, provide structural calculations and details for the installation. Reference: Section 307.1, IPC 2018.]
3. Comment not addressed, see markup on sheet P3. [Initial comment: Provide a cleanout for the horizontal grease waste line running north from the floor sink, P-4, that serves the 3-compartment sink. Reference: Sections 708.1.1 and 708.1.8, IPC 2018.]
03/21/2020 DJELLEN1 ELECTRICAL-COMMERCIAL REVIEW Needs Review