Permit Number: T20CM00074
Parcel: 11202033P

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T20CM00074
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/28/2020 AMARTIN1 MECHANICAL-COMMERCIAL REVIEW Reqs Change Closet installations of domestic clothes dryers (exhausting less than 200 CFM) require an opening in the dryer enclosure of at least 100 square inches. Reference: Section 504.6, IMC 2018. [Initial comment: Show how the dryer installation in each apartment complies with Section 504.6, IMC 2018.]
01/29/2020 MARTIN BROWN FIRE REVIEW Reqs Change Previous coments are still unanswered.
Please indicate whether a dedicated fire line is going to be installed. A separate permit and inspection is required for dedicated fire lines.
Is the fire alarm going to be a full fire alarm system or just sprinkler water flow monitoring ?

Previous coments:
Unclear if fire service is a dedicated line or tied into domestic water. Plans refer to detail 3 on sheet P2.1, which does not indicate fire service. If tied into domestic water, sprinkler demand must be added to domestic demand, per NFPA 13R. Provide calculations to prove demand. If a dedicated line for fire service, show fire line on a site plan.
Does project have an alarm system? Please indicate on plans.
02/03/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Clarify the detail call-outs used in the plumbing new work plan for the lower floor (sheet P1.1); Detail 3/P2.1 doesn't appear to relate to all of the locations it is used. Also, clarify detail call-outs on the CW & HW riser diagram 2/P2.1 referring to detail 3/P1.1. Reference: Section 107.2.1, IBC 2018.
2. Relabel the washer wall box on the second floor from P2 (Lavatory) to P5. Reference: Section 107.2.1, IBC 2018.
3. Provide details showing how the floor of the shower on the first floor is to be constructed in accordance with the requirements of 421.5, IPC 2018.