Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM00074
Parcel: 11202033P

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM00074
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2020 SARAH MEGGISON ZONING REVIEW Reqs Change Please provide more detailed plans indicating what is existing and what is changing. Please remove demo plan line layer from proposed floor plan. If the unit is being separated into 2 units, parking requirements need to be shown on plan.
01/06/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide heating and cooling load calculations that justify the capacities of the heating and cooling equipment specified for the project. Reference: Sections R302.2 and R403.7, IECC 2018 as amended by the City of Tucson.
2. Show how the dryer installation in each apartment complies with Section 504.6, IMC 2018.
01/06/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Ref; Plan Sheet E2.0. The 2nd floor power plan shows panel 'E' as existing. Is this the same location that New Panel 'E' is to be installed? Please clarify. Also for both panels 'E' and 'D', Provide compliance with NEC art 210.12D if applicable.
2. The line diagram shows panel 'E' as existing, the panel schedule shows panel 'E' as new. Please clarify.
3. Panel 'E' cannot be installed in the closet. NEC 240.24D.
4. Verify that grounds and neutrals are isolated at the existing service equipment being utilized for existing panel 'A' and 'B'.
5. Verify that there is a 120 volt GFI protected receptacle on the roof for mechanical equipment maintenance. NEC 210.63.
6. What is the letter (R) indicate at the existing service GEC.
7. Verify building steel and or metal water piping bonding conductor size is correct per NEC art 250.102, 250.104.

Ref; 2018 IBC 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal requirements, 2012 Tucson/Pima County Outdoor Lighting Code.
01/06/2020 SMEGGIS1 ENGINEERING REVIEW Passed
01/06/2020 RMCCOY1 BUILDING-COMMERCIAL REVIEW Reqs Change Building Safety Comments.
1. Please designate the correct residential occupancy for the project.
2. Please specify how the apartment unit on the 2nd floor will be accessed from the lower level. Provide a description of the exterior stairs.
3. Please provide structural calculations for the new beams and floor system.
4. Provide a foundation plan for the new thickened footings under the bearing loads in the existing slab.
5. Provide structural calculations for the new bearing footings.
6. Specify the types and provide specs. for new metal connectors.
7. Specify new bearing spread footings under all bearing walls.
01/06/2020 ROBERT SHERRY WATER REVIEW Completed
01/06/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Needs Review
01/06/2020 MARTIN BROWN FIRE REVIEW Reqs Change Unclear if fire service is a dedicated line or tied into domestic water. Plans refer to detail 3 on sheet P2.1, which does not indicate fire service. If tied into domestic water, sprinkler demand must be added to domestic demand, per NFPA 13R. Provide calculations to prove demand. If a dedicated line for fire service, show fire line on a site plan.
Does project have an alarm system? Please indicate on plans.
01/06/2020 RMCCOY1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
01/14/2020 AMARTIN1 OUT TO CUSTOMER Completed