Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T20CM00007
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/10/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the ventilation calculations using the actual amount of supply air from the two AC units. Specify the outside air flow rate for each unit. [Initial comment: Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3, IMC 2018.] 2. Coordinate the submitted exhaust fan specifications with the fan description and balancing data on the drawing. [Initial comment: Provide specifications for the proposed exhaust fans serving the Type I hood. Reference: Section 506.5, IMC 2018.] 3. Coordinate the submitted hood specifications with the hood description, required flow rate and dimensions on the drawing. [Initial comment: Provide specifications for the proposed Type I hood. If the hood is no longer listed, provide exhaust flow rate calculations based on Section 507.5.2, IMC 2018. Reference: Section 507.1, IMC 2018.] 4. What is the design flow rate for the makeup air unit? Show the size and route of the supply ducts and the connections to the external supply plenum attached to the front of the hood. Explain the relevance of detail 4/A1.3 to this activity; are you planning to install an Accurex fan on a Greenheck curb? [Initial comment: Provide adequate make-up air for the kitchen exhaust hood and provide specifications for the make-up air equipment and ductwork. Reference: Section 508.1 IMC 2018.] 5. Comment not resolved. You show one unit supplying 780 CFM and the other supplying 720 CFM but you indicate that units on this building are 10-ton units which supply 4000 CFM each. Verify the capacity of the existing rooftop units. [Initial comment: Clarify the new air distribution system. Is one rooftop unit providing the supply air? How is the air returning to the HVAC unit(s)? Reference: Section 107.2.1, IBC 2018.] |
03/13/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not resolved. Revise the section of gas piping between appliances 202 and 003. A load of 308 CFH of gas requires a 1-1/4" pipe for a developed length of 70-feet. Reference: Table 402.4 (2), IFGC 2018. [Initial comment: Revise the gas pipe sizes for the gas piping sections between appliances 202 and 007 based on the demand and developed pipe length for each appliance. Reference: Sections 402.1 and 402.3, IFGC 2018.] 2. Provide a shutoff valve for the cold water supply to the water heater. Provide a shut off valve and a sediment trap for the gas service to the water heater. Reference: Section 606.1 (8), IPC 2018 and Section 408.4, IFGC 2018. [Initial comment: Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, and valves. Reference: Sections 503.1, 504, 606.1 607.2, and 607.3, IPC 2018.] 3. Comment not addressed. P-6 is shown with direct connections. [Initial comment: Provide separate indirect waste pipes for each compartment of P-6, the 3-compartment sink, to protect against cross-contamination or fouling. Reference: Sections 801.2 and 802.1.1, IPC 2018.] 4. Comment not addressed. P-7 is shown with direct connections. [Initial comment: Provide indirect waste piping for P-7, the prep sink. Reference: Section 802.1, IPC 2018.] 5. Comment not addressed. P-9 is shown with direct connections. [Initial comment: Provide indirect waste piping for P-9, the soda machine. Reference: Section 802.1, IPC 2018.] 6. Correct the geometry of the vents serving P3, P4, P10, P11 and P7 in the kitchen. An indirect drain (e.g. P9) will terminate with either an air gap or an air break (as appropriate, see Chapter 8, IPC 2018) into a properly vented indirect waste receptor; the indirectly connected fixture does not have a vent. [Initial comment: Show that each trap and trapped fixture has been vented in accordance with one of the methods shown in the IPC. Reference: Section 901.2.1, IPC 2018.] 7. The specified trench drains are channels with outlets installed at an end cap or alongside the channel to which a trap is attached. Consult with a manufacturer's representative for installation instructions. [Initial comment: Provide traps for the trench drains. Reference: Section1002.1, IPC 2018.] 8. Comment not resolved; provide a vent on the downstream side of the grease interceptor. [Initial comment: Provide a vent downstream of the gravity grease separator to protect the seal for the grease separator. Reference: Section 1003.9, IPC 2018.] 9. Show the pipe sizes and cleanout locations on the revised waste riser diagram. Reference: Section 107.2.1, IBC 2018. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/17/2020 | LBOWERS1 | OUT TO CUSTOMER | Completed |