Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: ROW SWF - RE-SUBMITTAL
Permit Number - T19RW04076
Review Name: ROW SWF - RE-SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/29/2020 | JSANDER1 | START | START | Completed | |
09/29/2020 | JSANDER1 | REAL_ESTATE | REVIEW | Needs Review | |
09/29/2020 | JSANDER1 | DOT_ELEC | REVIEW | Reqs Change | 1. Requires Bussman fuse holders as previously provided in emai in response to questions on TUC46_111_A. 2. - If grounding from ground rods, copper wire should be #4 - If grounding from box to box bonding it can be #6 or #8 grounding wire. 3. 2in SCH 40 PVC conduit required for the City of Tucson luminaire power. 4. All Standard Engineering Notes required on plans in this order: DOTM Standard notes 1. Contractor shall notify adjacent residences/businesses of proposed construction activities at the preconstruction meeting. 2. A preconstruction meeting shall be held with the COT, Department of Transportation and Mobility construction and electrical Inspectors. 3. Contractor shall maintain site safety and pedestrian access through or around the work site pursuant to MUTCD requirements. For work located on major or collector roadways (>25MPH), pedestrian circulation shall be provided through or around the work site and NOT detoured to the other side of the street. 4. Barricade plan is subject to change as determined by the COT, Department of Transportation and Mobility construction inspector. Plan revisions must be documented. 5. Contractor shall repair all disturbed landscaping. This includes irrigation, plantings, groundcover, and hardscape. Irrigation lines under driveways must be in sleeves. 6. All concrete (sidewalk, curbing, driveways or curb access ramps) damaged or removed shall be replaced as a whole to the nearest joint. 7. Contractor shall practice stormwater good housekeeping measures during construction. |