Plan Number: T19PRE0230
Parcel: Unknown

Review Status: Completed

Review Details: PRESUBMITTAL MTG

Plan Number - T19PRE0230
Review Name: PRESUBMITTAL MTG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/02/2020 GDAURIA1 COT NON-DSD FIRE Completed *Hydrant location needs to be verified.
*TFD access and gate security need to be discussed.
*New plan differs from previous DP.
01/09/2020 ELISA HAMBLIN ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: Thursday Pre-submittal meeting - T19PRE0230
Address: 3190 W El Camino Del Cerro
Parcel(s): 101-20-0370 & 101-20-036J
Zoning: I-2
Existing Use: Heavy Equipment Sales
Proposed Use: Heavy Equipment Sales

TRANSMITTAL DATE: January 8, 2020

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The existing and proposed use appears to be Heavy Equipment Sales. This is a permitted use in the I-2 zone, subject to use-specific standards 4.9.13.Q.
3. It appears buildings/structures currently existing on the site have been added since the last approved development package. All structures existing on site need to be permitted.
4. The proposed addition of an office and service bay building appears to constitute a more than 25% expansion of the gross floor area of the site. This will require full code compliance for the site, including parking, landscaping and other development standards.
5. Parking is required at a ratio of 1 space per 300 square feet of gross floor area.
6. Documentation of a recorded access agreement should be provided with development package submittal.
7. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966.
01/09/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Completed *Hydrant location needs to be verified.
*TFD access and gate security need to be discussed.
*New plan differs from previous DP.
01/09/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 150 pm - T19PRE0230 - 3190 W EL CAMINO DEL CERRO - Site Preferred Concrete, new metal bldg.
" This property is currently served water via a 1" service line and a 1" water meter connected to the 12" water main west of the property. The existing service line and water meter probably have the capacity to also serve water to the proposed new building.
" If it is determined during the detailed building design review process that the existing service line and water meter do not have the capacity to serve the proposed new building, please contact Ray Munoz at 837-2207 in the Tucson Water New Services Section to discuss:
o The number of water service lines, water meters, and meter sizes, necessary to serve this development.
o The advantages and disadvantages of installing the necessary water meters via Tucson Water's Job Order Contract (JOC) process.

Tim Rowe, Sr. Engineeering Associate
Tucson Water
310 W. Alameda St., Tucson, AZ 85701, (520) 837-2106
01/09/2020 LOREN MAKUS ENGINEERING REVIEW Completed T19PRE0230 - 3190 W EL CAMINO DEL CERRO
1. Not critical or balanced.
2. Site is greater than an acre. Drainage report is required.
3. Retention analysis is required.
4. Maximize water harvesting.
12/27/2019 ANDREW CONNOR LANDSCAPE REVIEW Completed 7.6. LANDSCAPING AND SCREENING

7.6.2. APPLICABILITY

The provisions of this section apply to the following:

A. All new development; and,

B. Expansion of existing development, as provided below:

Buildings 10,000 Square Feet or Less

On sites where the gross floor area of the existing building(s) is 10,000 square feet or less, expansions in square footage of land area, floor area, lot coverage, or vehicular use area as follows.
a. If the expansion is less than 50%, the standards of this section apply only to the proposed expansion. Existing development on the site is subject to the zoning standards in effect at the time the existing development received zoning approval.

b. If the expansion is 50% or greater or if expansions as of February 15, 1991, cumulatively result in a 50% or greater expansion in land area, floor area, lot coverage, or vehicular use area, the standards of this section apply to the entire site.

If applicable show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements.