Plan Review Detail
Review Status: Completed
Review Details: PRESUBMITTAL MTG
Plan Number - T19PRE0229
Review Name: PRESUBMITTAL MTG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2020 | STEVE SHIELDS | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Steve Shields, Section Manager PROJECT: Thursday Pre-submittal meeting - T19PRE0229 Address: 3950 E Irvington Road Parcel(s): 140-02-002C Zoning: PAD-34 Existing Use: Utility - Distribution System Proposed Use: Utility - Distribution System TRANSMITTAL DATE: January 2, 2020 COMMENTS: 1. Development must comply with the Administrative Manual Section Section 2-06.0.0: Final Plat, Block Plat, Minor Subdivision, and Condominium Plat Applications. 2. The proposal is to add additional buildings and vehicle use areas to the existing site. 3. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966. |
01/02/2020 | GDAURIA1 | COT NON-DSD | FIRE | Completed | *Need to verify TFD access and hydrant locations. *Need to verify buiding heights. *Need to verify building identification (at main gates as well?) |
01/02/2020 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 150 pm - T19PRE0229 - 3950 E IRVINGTON RD - Site/Grading/SWPPP TEP Phase 2, five new buildings " The Pre-Submittal Meeting Application indicates that five (5) new building are to be constructed, but the pages from the New Development Plan only show the location of four (4). Where will the 5th building (the Connection Building) be constructed? " The four (4) new buildings shown within the pages from the New Development Plan are in an area that is not close to any Tucson Water mains. " Will all five (5) of the proposed buidlings be served by TEP's private water distribution system? |
01/07/2020 | SBEASLE1 | COT NON-DSD | TRAFFIC | Completed | *Need to verify TFD access and hydrant locations. *Need to verify buiding heights. *Need to verify building identification (at main gates as well?) |
12/24/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Indicate graphically, where possible, compliance with conditions of the PAD document. |
12/27/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | Provide a statement demonstrating compliance with the master drainage report. |