Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/03/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Indicate graphically, where possible, compliance with conditions of PAD-30 document. |
12/05/2019 | MASHFOR1 | COT NON-DSD | FIRE | Completed | Please make sure all Fire Hydrants and Fire Access is identified moving forward. |
12/05/2019 | MASHFOR1 | COT NON-DSD | FIRE | Completed | *Fire Code requires two fire access roads for the plan; with the second road remote to the main access per TFC D107.2 |
12/10/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | T19PRE0219 - 9801 E Drexel Road 1. Follow PAD requirements. 2. Part of block is balanced basin. 3. Full buildout of Drexel is required. |
12/11/2019 | ELISA HAMBLIN | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Elisa Hamblin, AICP; Principal Planner PROJECT: Thursday Pre-submittal meeting - T19PRE0219 Address: 9801 E Drexel Rd Parcel(s): 141-02-0230 Zoning: PAD 30 - Saguaro Trails Existing Use: Vacant Proposed Use: Single-family residential TRANSMITTAL DATE: December 11, 2019 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. The proposal is for development of a single-family residential subdivision within PAD planning area "E", or Block 6. This is a permitted use. 3. Proposed density and lot sizes appear to meet standards of the PAD. Ensure other development standards are met per the PAD document. 4. Ensure an updated residential density tracking table is included with tentative plat submittal, per PAD III.B.2.B. 5. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966. |
12/12/2019 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 150 pm - T19PRE0219 - 9801 E DREXEL RD - Tentative Plat Saguaro Trails " There is currently a 12" waterline along Drexel. " New public water mains to be constructed within this project, the following requirements will apply: o A water master plan will need to be submitted to Tucson Water's New Development section for review and approval. The Fire Department's fire flow requirements will need to be shown on the water master plan. o Upon approval of the water master plan, a design plan for the new water main will need to be submitted to Tucson Water's New Development section for review and approval. |
12/17/2019 | SBEASLE1 | COT NON-DSD | TRAFFIC | Completed | Review was not completed. |