Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PRESUBMITTAL MEETING
Plan Number - T19PRE0218
Review Name: PRESUBMITTAL MEETING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/03/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements. Provide actual recorded off site sign easement agreement. |
12/03/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | *Verify that fire hydrant use to the property would not block traffic on either Campbell or Benson Hwy. |
12/03/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | December 2, 2019 ACTIVITY NUMBER: T19PRE0218 PROJECT NAME: Restaurant PROJECT ADDRESS: 4555 S Campbell Ave PROJECT REVIEWER: Zelin Canchola Transportation The Transportation Engineering Division has reviewed the subject item and offers the following comments/conditions/requirements: Comments: Technical standard requirements will apply during the development plan process. Any relocation, modification, etc., of existing utilities and/or public improvements necessitated by the proposed development will be at no expense to the Public. Driveway on Campbell must meet access management guidelines "offset requirements" for both side of the streets. Driveways require deceleration lanes. The drive thru is too close to the Campbell Driveway. If backups occur vehicles will back up onto right of way. Transportation will not support this configuration. If you have any questions, I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov |
12/04/2019 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 230 pm - T19PRE0218 - 4555 S CAMPBELL AV - SiteGradingSWPPP McDonalds " No required fire flow was shown on the documents provided by the Applicant. Please be aware that the amount of fire flow required by the fire department may necessitate off-site improvements to the public water distribution system in this area. " Please see Ray Munoz at 837-2207 in the Tucson Water New Services Section to discuss: o The number of water service lines, water meters, and meter sizes, necessary to serve this development. o The advantages and disadvantages of installing the necessary water meters via Tucson Water's Job Order Contract (JOC) process. Fabien Elenes |
12/05/2019 | MASHFOR1 | COT NON-DSD | FIRE | Completed | *Verify that fire hydrant use to the property would not block traffic on either Campbell or Benson Hwy. |
12/05/2019 | SAMUEL ROGERS | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Samuel Rogers; Planner PROJECT: Thursday Pre-submittal meeting T19PRE0218 - McDonalds Address: 4555 S Campbell Ave. Parcel(s): 132-19-0940 Zoning: C-2 Existing Use: Vacant Proposed Use: Commercial (Food Service) TRANSMITTAL DATE: 12/05/2019 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06.0.0: Development Package (Tentative Plats and Site Plans). 2. Food service is an allowed use in the C-2 zone and subject to use specific standards 4.9.4.M.1 and 4.9.13.P 3. E Benson Hwy and S Campbell Ave are MS&Rs; MS&R setbacks will apply to all street side setbacks. The required MS&R setbacks are the greater of 21' or the wall height of the structure measured from the back of the existing or future curb location. It appears All ROW on E Benson Hwy and S Campbell Ave has already been taken. 4. Parking is required at 1 space/100 SF of GFA; required parking is 50 spaces. The proposal appears adequate. 5. Clarify the purpose of the 24' strip south of the site. Is the area planned to be leased or be a cross access agreement? If used for access to the site, it must be included in the development package. 6. Is the sign easement proposed or already recorded? If off-site signs are proposed, review is required with PDSD's Signs Section - Contact Heather Thrall at Heather.Thrall@tucsonaz.gov or (520) 837-4961 7. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at samuel.rogers@tucsonaz.gov or (520) 837-6932. |
12/05/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | T19PRE0218 - 4555 S Campbell Av 1. Plat shows drainage easement. This must be shown on the DP. 2. Balanced basin: retention and detention required. Drainage report required. 3. Maximize water harvesting. 4. Provide waste stream calculation. 5. Sidewalk must meet current standard. |