Plan Number: T19PRE0211
Parcel: Unknown

Review Status: Completed

Review Details: PRESUBMITTAL MEETING

Plan Number - T19PRE0211
Review Name: PRESUBMITTAL MEETING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/15/2019 ANDREW CONNOR LANDSCAPE REVIEW Completed Indicate graphically, where possible, compliance with PAD-34 document.
11/18/2019 ZELIN CANCHOLA COT NON-DSD TRAFFIC Completed No adverse comments. Standard requirements will apply
11/19/2019 LOREN MAKUS ENGINEERING REVIEW Completed 1. Requires updated DP for entire site.
2. Must be consistent with master drainage report.
11/20/2019 ELISA HAMBLIN ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: Thursday Pre-submittal meeting - T19PRE0211
Address: 3950 E Irvington Rd
Parcel(s): 140-02-002C
Zoning: PAD-34
Existing Use: Utility - Generating System
Proposed Use: Utility - Generating System

TRANSMITTAL DATE: November 20, 2019

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The proposal is the for the addition of a fueling station for use by TEP only (not public access). The use is permitted per PAD-34.
3. Parking at a ratio of 1 space per employee is required. Updated information should be submitted with development package to verify this standard is met.
4. Ensure compliance with the development standards of PAD-34 and the Procedures for Development Review as found in Section IV.B. of the PAD document.
5. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966.
11/20/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 230 pm - T19PRE0211 - 3950 E IRVINGTON RD - SITE TEP fueling facility

No comments
11/22/2019 MASHFOR1 COT NON-DSD FIRE Completed All TFD requirments will need to be verified at Presubmittal meeting with Glenn D' Auria.