Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION
Plan Number - T19PRE0178
Review Name: PREAPPLICATION
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/30/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | No adverse comments. Standard requirements will apply at time of development plan process. |
10/01/2019 | MASHFOR1 | COT NON-DSD | FIRE | Completed | |
10/04/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Indicate graphically, where possible, compliance with conditions of PAD-12 document. Ensure that all Zoning comment are addressed. |
10/09/2019 | ELISA HAMBLIN | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Elisa Hamblin, AICP; Principal Planner PROJECT: Thursday Pre-submittal meeting T19PRE0178 Address: 10544 E Seven Generations Way Parcel(s): 141-01-2130 and 141-01-211C Zoning: PAD-12 Existing Use: Civic - Instructional School Proposed Use: Residential, Instructional School TRANSMITTAL DATE: October 9, 2019 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. The proposal is to expand an existing instructional school (dance studio) into a new building, which would include 1,442 sq ft of dance studio and 510 sq ft of residential use. The existing dance studio is 2,589 sq ft in size. 3. As a unified development on a two parcels, a lot combination will be required to be processed with Pima County. 4. The proposed land use is permitted per the Civano PAD. However, a determination is needed from the City's Zoning Administrator, Russlyn Wells. Items needing a determination include how much gross floor area can be dedicated to a non-residential use and whether this development would be reviewed as residential or non-residential use. 5. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966. |
10/09/2019 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 130 pm - T19PRE0178 - 10544 E SEVEN GENERATIONS WY - SITELOT MERGER Ballet Rincon - Currently this property is served by a 1" service connected to the existing 8" water main located in Seven Generations Way. Existing Studio is served by a 1" service along with a Fire Service. - No required fire flow was shown on the documents provided by the Applicant. Please be aware that the amount of fire flow required by the fire department may necessitate off-site improvements to the public water distribution system in this area. Please contact Ray Munoz at 837-2207 in the Tucson Water New Services Section to discuss when you receive such information. |
10/10/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | The Engineering Section has no comments. |