Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T19PRE0173
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION

Plan Number - T19PRE0173
Review Name: PREAPPLICATION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/17/2019 LOREN MAKUS ENGINEERING REVIEW Completed 1. Clarify the amount of new impervious pavement. Storage yard appears to have a gravel surface.
2. Provide water harvesting to offset new impervious area.
3. Show roof drainage and keep sidewalks flood-free for up to a 10-year event.
09/17/2019 ANDREW CONNOR LANDSCAPE REVIEW Completed UDC 7.6. LANDSCAPING AND SCREENING
7.6.2. APPLICABILITY
Buildings Greater Than 10,000 Square Feet
If the expansion is 25% or greater or if expansions as of February 15, 1991, cumulatively result in a 25% or greater expansion in land area, floor area, lot coverage, or vehicular use area, the standards of this section apply to the entire site.
Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements.
Indicate graphically, where possible, compliance with conditions of rezoning.
09/18/2019 MASHFOR1 COT NON-DSD FIRE Completed The addition of the new building will require Fire Sprinklers and Alarm based on the assumed usage. Moving forward please provide the Occupancy type/usage and load of the proposed building. Based on what is being viewed on this review the above items will be required from TFD
09/23/2019 ZELIN CANCHOLA COT NON-DSD TRAFFIC Completed Standard requirements will apply.
09/26/2019 ELISA HAMBLIN ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: Thursday Pre-submittal meeting T19PRE0173
Address: 3566 E Speedway Bl
Parcel(s): 125-10-041B, 125-12-042A, -041A, -0400, -0390, -025E, -025F, -0290 & -0300
Zoning: C-2
Existing Use: Retail - Vehicle Rental and Sales
Proposed Use: Retail - Vehicle Rental and Sales

TRANSMITTAL DATE: September 25, 2019

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The proposal is for the addition of a new building and associated parking on an existing auto dealer site. The use is permitted in the C-2 zone, subject to use-specific standards 4.9.9.G.1& .2.
3. The proposed building expansion constitutes a more than 25% expansion of the site. As such, full site compliance with current code standards is required.
4. The proposed building height of 44' is not permitted in C-2 zoning, which allows a max height of 40'.
5. The setback near the southeast corner of the proposed building may be a problem. The building must be setback 1.5 times the building wall height from residential zoning. Other setbacks appear adequate.
6. Parking appears adequate but will be verified with development package submittal.
7. As development is proposed across multiple lots, a lot combination processed through Pima County is required.
8. Ensure all rezoning conditions associated with case C9-07-33 are met.
9. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.


If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966.
09/30/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed T19PRE0173 - 3566 E SPEEDWAY BL - SITEGRADING Quebedeaux, addition
1. The proposed building is directly over an existing 3" public asbestos cement water main and an inactive 2" water service line that was constructed in 1958. These water lines will need to be properly abandoned, as part of this project.
2. Please see Ray Munoz at 837-2207 in the Tucson Water New Services Section to discuss:
A. The advantages and disadvantages of abandoning these water lines using Tucson Water's Job Order Contract (JOC) process.
B. Any questions you may have about the number of water meters, and meter sizes, necessary to serve this development.

Tim Rowe
Tucson Water
Tim.Rowe@TucsonAz.gov