Plan Number: T19PRE0168
Parcel: Unknown

Address:
7211 S PARK AV

Review Status: Completed

Review Details: PREAPPLICATION

Plan Number - T19PRE0168
Review Name: PREAPPLICATION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/11/2019 ANDREW CONNOR LANDSCAPE REVIEW Completed No landscape comments for PCC facility.
09/12/2019 MASHFOR1 COT NON-DSD FIRE Completed ***Please include this on the plan set moving forward:

IFC 2018- 903.2.9 Group S-1 for the Hanger Condition 1 will require Fire Sprinklers and may require Fire Alarm upon further review.

Based on the seperate E Group and or usage it will also require the addition of Fire Sprinklers/Alarms as they may already exist in the existing portion of the College as I would assume.
09/18/2019 ELISA HAMBLIN ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Elisa Hamblin, AICP; Principal Planner

PROJECT: Thursday Pre-submittal meeting T19PRE0168
Address: 7211 S Park Av
Parcel(s): 14043011A
Zoning: I-2
Existing Use: Education - Postsecondary Institution
Proposed Use: Education - Postsecondary Institution

TRANSMITTAL DATE: September 18, 2019

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The proposal is expand an existing educational use as part of the PCC Aviation Technology Center. The existing use has approx. 34,000 sf. The expansion is for an additional 62,058 sf.
3. An expansion of more than 25% of gross floor area on a site requires the site to be brought up to full code compliance. Although the proposed expansion is just for PCC Aviation Technology Center, full code compliance may be required depending on the total square footage of the entire site. A site is defined as the land area consisting of a portion of a lot, an entire lot, or contiguous lots, not including dedicated public property, designated for development as a single entity.
4. Parking requirements for postsecondary institutions are 1 space per 200 sf of gross floor area. Review of the last approved site plan will be needed to determine the total required parking.
5. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966.
09/19/2019 LOREN MAKUS ENGINEERING REVIEW Completed 1. Floodplain use permits will be required.
2. A drainage report consistent with the TIA master drainage report is required.
09/25/2019 SBEASLE1 COT NON-DSD TRAFFIC Completed
09/25/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed