Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION
Plan Number - T19PRE0160
Review Name: PREAPPLICATION
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/23/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements |
08/27/2019 | MASHFOR1 | COT NON-DSD | FIRE | Completed | Please list occupancy type/usage to determine if Fire Sprinklers/Alarms will be required. Provide fire hydrant (water source) locations existing or new. Provide all this information on the plan set moving forward. |
08/27/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | 1. No floodplain. Not balanced or critical. 2. Since this was a part of a parcel larger than 1 acre after September 1984, 5-year threshold retention is required. 3. Water harvesting must be maximized. 4. Show waste stream calculation and volume requirements. |
08/30/2019 | ELISA HAMBLIN | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Elisa Hamblin, AICP; Principal Planner PROJECT: Thursday Pre-submittal meeting T19PRE0160 Address: 2940 N Oracle Rd Parcel(s): 107-12-170G Zoning: C-2 Existing Use: Vacant Proposed Use: Multi-family residential TRANSMITTAL DATE: August 30, 2019 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. The proposal is for multi family residential use, which is a permitted use in the C-2 zone. 3. Residential density is limited to 44 units per acre in the C-2 zone. Additional information on total number of units is needed. 4. As this site has frontage on both Oracle Rd (Major Street) and Blacklidge Dr, developing area setbacks will be applied on both streets. Along Oracle, the setback is 21' or the building height as measured from the back of future curb. On Blacklidge the setback is 21' or the building height as measured from the outside edge of adjacent travel lane. The concept appears to be adequate but additional information is required on the submitted development package. 5. Pedestrian access is required from each street on which the site has frontage. 6. Additional information on the type of units proposed is needed in order to determine required parking. 7. Cross access easement will be required for this property to access through the adjoining site. 8. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966. |
09/04/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | Technical standards will apply |
09/04/2019 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | Tucson Water's Comments: " There is an existing 8" public water main in Blacklidge Drive, on the north side of the property. " The normal water pressure in this main is in the 67 to 74 psi range. " No required fire flow was shown on the documents provided by the Applicant. Please be aware that the amount of fire flow required by the fire department may necessitate off-site improvements to the public water distribution system in this area. " Please see Ray Munoz at 837-2207 in the Tucson Water New Services Section to discuss: o the number of water meters, and meter sizes, necessary to serve this development, and o the possibility of installing the necessary water meters via Tucson Water's Job Order Contract (JOC) process. " Additional information about the fire flow, the number, size and type of water meters needed for this development will need to be supplied to Tucson Water to determine if modeling needs to be performed to verify the existing public water mains have the capacity necessary to serve the proposed development. This can be done via your interactions with the Tucson Water New Services Section. Tim Rowe Tucson Water |