Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION
Plan Number - T19PRE0035
Review Name: PREAPPLICATION
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/28/2019 | ELISA HAMBLIN | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Elisa Hamblin, AICP; Principal Planner PROJECT: Thursday Pre-submittal meeting (T19PRE0035) Address: 501 S Meyer Av Parcel(s): 117142870, 117142880, 117142890, 117142900, 117142910, 117142850, 117142830 Zoning: HC-3 and HO-3 Existing Use: Residential, Vacant Proposed Use: Unknown, Proposed Minor Subdivision TRANSMITTAL DATE: February 28, 2019 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-07 - Final Plat, Block Plat, Minor Subdivision, and Condominium Plat Applications. 2. A supplemental site plan (with relevant building elevations) will be required at time of submittal. This will be used to ensure that nonconforming lots are not being created. a. In the HC-3 zoned portion of the site, residential uses are limited to 80% lot coverage. Ensure this standard is being met with the proposed lot lines. b. In the HO-3 zoned portion of the site, the required interior perimeter yard setback is 10 ft or ¾ the height of the structure, whichever is greater. Residential uses are also limited to 75% lot coverage. Minimum lot size for residential uses is 5,000 sf. Ensure these standards are being met with the proposed lot lines. 3. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Minor Subdivision review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. 4. The proposal is adequate to proceed with submittal of the Minor Subdivision application. If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966. |
02/28/2019 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | Depending on the nature of the future residential development a looped line connecting to S Meyer Ave and W Kennedy Street may be required based on fire flow and other water service requirements. A full master plan and design plan may be needed in the future. At this time it is not anticipated that any Water Department services are required as part of the minor subdivision process with existing uses anticipated to continue unchanged. Thanks. Paul Baughman, PE, CFM Civil Engineer Tucson Water 310 W Alameda St. Tucson, AZ 85701 520-837-2048 |
02/28/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Residential Subdivisions Street landscape borders are required for residential subdivisions of eight or more lots. |
02/28/2019 | MARTIN BROWN | FIRE | REVIEW | Approved | |
03/04/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | Minor subdivision is allowed. |
03/11/2019 | ALEXANDRA HINES | COT NON-DSD | TRAFFIC | Passed | |
03/11/2019 | ALEXANDRA HINES | ZONING-DECISION LETTER | WRITE DECISION LETTER | Completed | Pre-Submittal Complete Notice: T19PRE0035 Project Description: MINOR SUB - ROLLINGS BARRIO LOTS 1-7 Prior to submitting, view the meeting review details on www.tucsonaz.gov/pro, search by activity number above. Thank you, Alexandra Hines, AICP Lead Planner at Planning and Development Services, City of Tucson 201 N Stone Ave 1st Floor, Tucson, AZ 85701 (520) 837-6975 - alexandra.hines@tucsonaz.gov |