Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION
Plan Number - T19PRE0024
Review Name: PREAPPLICATION
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/12/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Completed | T19PRE0024 1) Accessible parking and path must be on site. If a portion of the pathway, from parking to the building, is offsite a TSMR will be needed 2) Bollards or some other barrier will be needed to prevent vehicular access to the curb cut adjacent to the accessible parking. Maximum space between openings is 5' 3) Previously issued DP17-0106 showed onsite parking. If this DP is no longer being used it will need to be withdrawn along with T18CM01610 John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
02/12/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | 5.8. "H" HISTORIC PRESERVATION ZONE (HPZ) Landscaping Plantings and other ornamental features shall reflect the historic period of the subject structure. Landscaping may be reviewed in the context of a required HPZ review; landscaping alone shall not be considered through an HPZ review. Indicate graphically, where possible, compliance with conditions of HPZ or Overlay approval. |
02/13/2019 | MASHFOR1 | COT NON-DSD | FIRE | Completed | |
02/20/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | 1. Add new curb access ramp at north west corner ofSimpson, and main. 2. Use PAG Standard for details not COT. A right of way permit will be required from TDOT at time of construction in the right of way. |
02/21/2019 | ELISA HAMBLIN | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Elisa Hamblin, AICP; Principal Planner PROJECT: Thursday Pre-submittal meeting (T19PRE0024) Address: 319 W Simpson St Parcel(s): 117-14-0200 Zoning: HC-3 Existing Use: Vacant building, previous Food Service Proposed Use: Commercial - Administrative and Professional Office TRANSMITTAL DATE: February 21, 2019 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. This site is located within a historic preservation zone. All development is subject to design review. 3. The proposal is for a change of use from food service to an administrative and professional office use. 4. The parking required would be 1 space per 300 square feet. However, as a contributing property in a National Register Historic District with a 1:300 parking ratio, this site is exempt from Section 7.4.4.B, Minimum Number of Motor Vehicle Spaces Required, provided the historic designation of the contributing structure is maintained. 5. Other site changes proposed appear to be minor, including the trash enclosure, accessible parking, and site wall. 6. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at elisa.hamblin@tucsonaz.gov or (520) 837-4966. |
03/05/2019 | AHINES2 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | It looks like this can be handled via a JOC. Please see comments below. Please see below comments for T19PRE0024 319 W Simpson St. 1) Fire hydrant, fire line and water service needs may be able to be handled through our New Services section of Tucson Water if the cost for these requirements is less than $50,000. 2) Please see the Tucson Fire Department to determine any Fire suppression requirements you will need Tucson Water to fulfill. Once these are known contact Hugo or Ray in New Services to determine if they can assist you. 3) If New Services is not able to assist you with your development there is a standard development review process that involves a water availability letter, a water master plan and a water design plan that are submitted to the New Development section at Tucson Water. Please let me know if you have any questions or concerns. Paul Baughman, PE, CFM Civil Engineer Tucson Water 310 W Alameda St. Tucson, AZ 85701 520-837-2048 |