Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T19PI00025
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/10/2019 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | December 10, 2019 T19PI00025 Union on 6th Zelin Canchola Add "Back in Parking Only" signs along 5th Ave |
12/16/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
12/16/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
12/16/2019 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Reqs Change | City of Tucson Traffic Maintenance has added the following Red Line Comments: (see attachments) Off-site Improvement Plans Page 2 of 9, ADD Key Note No.3 located at approximately 13+15+/-, RT 35' +/- Representing an EXISTING LIGHT TO REMAIN. Additionally, please ensure new SITE AMENITY as shown on plan, does not restrict access to existing light pull box at this location (light pull box IS represented/shown on plan). Development Plans Page 4 of 30, ADD Key Note No.9 located at approximately 13+15+/-, RT 35' +/- Representing an EXISTING LIGHT TO REMAIN. Additionally, please ensure new SITE AMENITY as shown on plan, does not restrict access to existing light pull box at this location (light pull box IS represented/shown on plan). With the exception of the aforementioned, COT Traffic Maintenance has no additional comments or concerns at this time. |
12/16/2019 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Completed | |
12/16/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
12/16/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
12/16/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
12/16/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
12/16/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
12/16/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
12/16/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
12/16/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
12/19/2019 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | December 18, 2019 SUBJECT: Offsite Improvements Plan for The Union on 6th PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments and return redlined drawings with subsequent submittal. 1. Add the plan number “U-2019-012” in the title block of each sheet. 2. Add PIA activity number “T19PI00025” on cover sheet. 3. Sheet 1: Revise Paving + Grading Note #3 to indicate the use of City of Tucson Mix #2. 4. Sheet 2: Provide curb returns with a minimum of 12’ radii at Herbert Avenue an 6th Street pursuant to COT TSN 10-01.3.2.D. 5. Sheet 2 through 5: Provide all information and details of all landscaping, site amenities and hardscape proposed within the public rights-of-way. This document should stand alone and not refer to other documents for details. 6. Sheet 3: The sidewalk on the west side of parcel 117-05-0360 will need to be replace to provide a ADA compliant pathway. The proposed curb access ramps adjacent to the existing sidewalk will have to built out of compliance to match the existing slope, which would not be acceptable. 7. Sheet 3: Revise drawing to indicate placement of curb along the parking bays. 8. Sheet 3: Revise Cross Section 1 (5th Avenue) to provide horizontal dimensions. 9. Sheet 3: Provide a detail of the channel proposed in the parking island near the south garage entrance, indicate outlet invert. The open channel poses a potential hazard to pedestrians; the channel will need to be covered. 10. Sheet 3: Revise drawing to show the parking area, along 5th Ave, will be uniformly graded to the west into proposed flowline shown on 5th Avenue cross section. 11. Sheet 5: Provide a detail of the SW corner of 4TH Avenue and 6th Street. Provide spot grades to assist in layout of curb access ramps. 12. Sheet 5: Revise Cross Section 1 (4th Avenue) to provide horizontal dimensions. Show proposed railing. 13. Sheet 5: An easement may be required for proposed steps in the public rights-of-way. Please inquire with the City of Tucson Department of Transportation Real Estate division for details. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
12/19/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
12/19/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |