Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T19PI00018
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/08/2019 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | T19PI00018 - La Tierra Reserve - I-2019-03 Zelin Canchola Engineering Review for Traffic Engineering Add Striping plan for 6th Avenue improverments. Striping can match what is existing south of Medina (along 6th Ave) |
10/17/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
10/17/2019 | CRAIG SALTZMAN | DOT ENGINEERING | REVIEW | Denied | 1) Sht. 1 of 9 Add PIA number T19PI00018 under title top center of sheet. 2) Sht 1 of 9 Remove printer test pattern from upper right corner and replace with a location map. The purpose of this map is to help sub contractors find the project site. 3) All sheets add Plan Number I-2019-035 in title Blocks. 4) It may be our printer, but the P in Public was not printered in the Title/Block. 5) Add Structual Pavement Section detail. Plans shall be a stand alone document (construction and as a referance document after copletion). Remove all notes "New AC pavement section (Per Project Geotechical report)" 5) Add curve data for all curves. Plans shall be a stand alone document. 6) Sht. 4 of 9 Show slope of pedestrian path way across Medina Road to the south of new access ramp. |
10/17/2019 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
10/18/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | |
10/18/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | Please submit utility notification confirmation for the utility companies listed on the PIA utility notification list. The list can be found at: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Jan14z.pdf |
10/18/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
10/18/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | Please submit utility notification confirmation for the utility companies listed on the PIA utility notification list. The list can be found at: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Jan14z.pdf |
10/18/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
10/18/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
10/18/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
10/18/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
10/18/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
10/18/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
10/18/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review |