| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/30/2019 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | Streets irrigation does not have any concerns or comments. |
| 05/02/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
| 05/13/2019 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | May 13, 2019 SUBJECT: T19PI00012 Sueno Hermoso PROJECT REVIEWER: Zelin Canchola, TDOT Review Section RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Traffic Engineering. The proposed plan requires the following change: 1. Identify stop sign and street name location at new road connection to E. Alvord Rd, and S. Randall Blvd 2. Eliminate striping for on street parking on E. Alvord Rd., and S Randall Blvd. If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov |
| 06/04/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 06/04/2019 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | June 4, 2019 SUBJECT: Sueno Hermoso Lots 1 - 6, Offsite Improvements U-2019-004 PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Engineering Review Section has reviewed the subject PIA paving plan and recommends a conditional approval of the drawings. The following comments need to be addressed and plans revised prior to submitting mylars for signatures. 1. Include the plan number "U-2019-004" in the title block of each sheet. 2. Include the PIA activity number "T19PI000012" on cover sheet. 3. Include development plan number on cover sheet. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
| 06/04/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | Please submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way can be found at the following link: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf |
| 06/04/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
| 06/04/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | Please submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way can be found at the following link: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf |
| 06/04/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | Please submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way can be found at the following link: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf |
| 06/04/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | Please submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way can be found at the following link: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf |
| 06/04/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | Please submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way can be found at the following link: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf |
| 06/04/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | Please submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way can be found at the following link: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf |
| 06/04/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | Please submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way can be found at the following link: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf |
| 06/04/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | Please submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way can be found at the following link: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf |
| 06/04/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review | Please submit utility notification receipts. A list of utility companies that need to be notified of the proposed improvements in the public right-of-way can be found at the following link: https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf |