Plan Number: T19PI00011
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T19PI00011
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/10/2019 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Completed
04/10/2019 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
04/10/2019 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
04/10/2019 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
04/10/2019 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
04/10/2019 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Completed
04/10/2019 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
04/10/2019 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
04/10/2019 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
04/16/2019 JIM FEMLING DOT STREET MAINTENANCE REVIEW Approved Streets irrigation and landscape maintenance does not have any concerns at this location. Paul Rosenboom
05/08/2019 ZELIN CANCHOLA DOT TRAFFIC REVIEW Reqs Change May 8, 2019

SUBJECT: T19PI00011 MLK Jr Way


PROJECT REVIEWER: Zelin Canchola, TDOT Review Section

RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Traffic Engineering. The proposed plan requires the following change:


1. Identify key note 5 on the plan sheets

2. Add new striping quantities

3. No striping on Linderbrook Drive required.

4. Add End of road markers at the end of pavement on Limderbrook Dr

5. Add diagonal striping within gore area on Camino Seco.

6. New pavement required to accommodate new striping on Camino Seco. (obliteration may not be possible with existing pavement's condition)

7. If adding pavement on Linderbrook eliminate keynote 14

If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov
05/15/2019 CSALTZM1 DOT ENGINEERING REVIEW Denied 1) Sht. 1 of 17 ; Top center of sheet under Title add
PI No. T19PI00011

2) Sht. 1 0f 17; Add recorded sequence to cover Sheet (plat, grading plan, etc.)

3) All sheets add to title block Plan No. I-2019-007.

4) Sht. 2 of 17; General Notes , note 3. Remove" P.A.G. SSPI Section 406" and replace w/ City of Tucson Mix # 2.

5) Sht. 2 of 17; General Notes, note 13. Remove "Gary Wittwer@400-2645" and replace with" David Marhefka @ 403-5074".

6) Sht. 3 of 17; Add Structural Pavement Section.

7) Sht. 3 of 17; Catch Basin Details, Stations and elevations use Engineering Dimensions (Feet and tenths of a foot). Dimension of the structure use Carpenter Dimensions (feet and inches).

8) Sht. 4 of 17: Detail Basin Detail see note 7 above.

9) Sht. 5 of 17; Thickened Pavement Edge Detail, Change 11Inches to 12inches. Change dimension line for only the thickness of the thickened edge of the new AC pavement.

10) Sht. 6 of 17; Maintain full pavement section from Station 6+47.62 to Station 10+00 match line between Phase 1A and 1B. Include all drainage structures required for full width section.

11) Change Linderbrook Dr Tapered Section to full pavement section per note 10.
05/20/2019 GARY WITTWER DOT LANDSCAPE REVIEW Approved
05/21/2019 RICHARD LEIGH DOT PERMITS & CODES REVIEW Needs Review
05/21/2019 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
05/21/2019 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed