Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T19PI00009
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/17/2019 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
06/25/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | Reviewer: David Marhefka 520-837-6618 David.Marhefka@tucsonaz.gov 2nd Review _ T19PI00009 - La Estancia de Tucson Block 26 - I-2019-006 TDOT Landscape Comments: 1. Please include the Notes for Planting in the ROW on the Landscape Plans. (Also Attached) City of Tucson Department of Transportation Standard Notes for Planting in ROW 1. It is the owner’s responsibility to keep the Sight Visibility Triangles (SVT), and the pedestrian access area clear of vegetation at all times, per Land Use Code (LUC) section. 2. It is the owner responsibility to keep a 5’ wide by 7’ tall clear pedestrian access open across the entire property. 3. It is the owner responsible to keep vegetation from growing past the curb line clear, and keep a 15’ high clear zone over the travel lane. 4. Final plant locations must be in compliance with all utility setback requirements. 5. The owner understands that if the City of Tucson Transportation Department or any utility company needs to work within the ROW in the landscaped area, plants and irrigation may be destroyed without replacement or repair. 6. The owner takes full liability for this landscape and irrigation, and any damage to roadway, sidewalk and utilities. 7. The only private irrigation equipment that is allowed within the ROW are lateral lines, tubing and emitters that are not under constant pressure. All other equipment must be on private property. (excluding water meter) 8. Contractor to obtain a Right Of Way permit prior to construction within the right-of-way. 2. Replace the Irrigation in ROW notes on Sheet 13 of 18 with the following notes: (also attached) Adjust Detail E on Sheet 16 to reflect the depth change. City of Tucson, Department of Transportation Requirements for placement of Private Irrigation Facilities Roadway Crossings within the Public Rights-of-Way • Private irrigation facilities roadway crossings will only be permitted in residential roadways and NOT permitted in arterial or collector roadways. • Lateral lines under constant pressure shall not be permitted in the public rights-of-way. • The HOA will register private irrigation facilities placed in the public rights-of-way with Arizona 811 and become an Arizona 811 Blue Stake Inc. member. • Minimize the number of roadway crossings. • Sleeves must be in a recorded easement (easement width is dependent on what is needed for installation and/or repairs). To the extent possible, the easements should be created at the time of development/platting. • Irrigation lines shall be placed in ductile iron sleeves. • Sleeve should extend beyond the right-of-way (into private property), unless otherwise approved by TDOT. • HDPE continuous line (no joints under the pavement) • Irrigation lines shall have a minimum of thirty (30) inches of cover. • Detectable marking tape shall be installed. • Curb shall be marked/stamped with “IS” (Irrigation System) and/or placard at back of curb. 3. Indicate the ROW line on the plans with a keynote for clarity. |
07/12/2019 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approved | |
07/16/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
07/16/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
07/16/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
07/16/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
07/16/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
07/16/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
07/16/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
07/16/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
07/16/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
07/16/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
07/16/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed |