Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T19PI00009
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/25/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Please submit landscape and irrigation plans for common areas. We need to see if you are crossing public streets with private irrigation lines. |
04/08/2019 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | April 8, 2019 T19PI00009 La Estancia de tucson Block 26 Eliminate both Stop signs at t-intersections: Calle Arco Iris and Via Aguarachay |
04/19/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf. |
04/19/2019 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Completed | |
04/19/2019 | RICHARD LEIGH | DOT PERMITS & CODES | REVIEW | Completed | |
04/19/2019 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | April 11, 2019 SUBJECT: La Estancia De Tucson, Block 26 - Lots 1-47 Paving and Drainage Improvement Plans PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Engineering Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments with subsequent submittal. 1. Include the plan number "I-2019-007" in the title block of each sheet. 2. Include the PIA activity number "T19PI00009" on cover sheet. 3. Use latest TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering. 4. The City of Tucson has adopted the Pima Associations of Governments (PAG) Standard Details and Specifications. Update notes/details on all sheets to reference the appropriate PAG standards. 5. Provide catch basin and storm drain pipe tables. 6. Sheet 5, Provide a curb access ramp opposite and inline with the proposed access ramp at Sta. 5+13, 13' RT . 7. Sheet 6, Depict storm drain from SDMH #3 to CB 2.0 in plan view. 8. Sheets 5 & 7: Provide location and details of vertical to wedge curb transitions at the intersections with Via Aguarachay and Camino Boleadores. 9. Delineate and label all easements. Additionally, a flowage easement will have to be provided for channel located in between lots 30 and 3. 10. Indicate that sidewalk will be placed pursuant to City of Tucson Technical Standards Manual along Kolb Rd. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
04/19/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
04/19/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf. |
04/19/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
04/19/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf. |
04/19/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf. |
04/19/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf. |
04/19/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf. |
04/19/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf. |
04/19/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf. |
04/19/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review | Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf. |