Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T19PI00009
Parcel: Unknown

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T19PI00009
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/25/2019 GARY WITTWER DOT LANDSCAPE REVIEW Denied Please submit landscape and irrigation plans for common areas. We need to see if you are crossing public streets with private irrigation lines.
04/08/2019 ZELIN CANCHOLA DOT TRAFFIC REVIEW Reqs Change April 8, 2019
T19PI00009
La Estancia de tucson Block 26

Eliminate both Stop signs at t-intersections:

Calle Arco Iris and Via Aguarachay
04/19/2019 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Needs Review Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf.
04/19/2019 JIM FEMLING DOT STREET MAINTENANCE REVIEW Completed
04/19/2019 RICHARD LEIGH DOT PERMITS & CODES REVIEW Completed
04/19/2019 RICHARD LEIGH DOT ENGINEERING REVIEW Reqs Change April 11, 2019


SUBJECT: La Estancia De Tucson, Block 26 - Lots 1-47 Paving and Drainage Improvement Plans

PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review

RESUBMITTAL REQUIRED: TDOT Engineering Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments with subsequent submittal.

1. Include the plan number "I-2019-007" in the title block of each sheet.

2. Include the PIA activity number "T19PI00009" on cover sheet.

3. Use latest TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering.

4. The City of Tucson has adopted the Pima Associations of Governments (PAG) Standard Details and Specifications. Update notes/details on all sheets to reference the appropriate PAG standards.

5. Provide catch basin and storm drain pipe tables.

6. Sheet 5, Provide a curb access ramp opposite and inline with the proposed access ramp at Sta. 5+13, 13' RT .

7. Sheet 6, Depict storm drain from SDMH #3 to CB 2.0 in plan view.

8. Sheets 5 & 7: Provide location and details of vertical to wedge curb transitions at the intersections with Via Aguarachay and Camino Boleadores.

9. Delineate and label all easements. Additionally, a flowage easement will have to be provided for channel located in between lots 30 and 3.

10. Indicate that sidewalk will be placed pursuant to City of Tucson Technical Standards Manual along Kolb Rd.

If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov.
04/19/2019 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
04/19/2019 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Needs Review Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf.
04/19/2019 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed
04/19/2019 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Needs Review Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf.
04/19/2019 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Needs Review Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf.
04/19/2019 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Needs Review Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf.
04/19/2019 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Needs Review Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf.
04/19/2019 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Needs Review Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf.
04/19/2019 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Needs Review Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf.
04/19/2019 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Needs Review Utility notification receipts will need to be submiited. A list of the uility companies that need to provided a copy of the plan set can be found at https://www.tucsonaz.gov/files/transportation/UTLAWAREMEM_rev2019Mar27z.pdf.