Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T19PI00005
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/06/2019 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | March 6, 2019 SUBJECT: Paving Gost River Ranch PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments and return redlined drawings with subsequent submittal. 1. Add the plan number "I-2014-003" in the title block of each sheet. 2. Add PIA activity number "T19PI0005" on cover sheet. 3. Use latest TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering. 4. Revise General Grading and Paving Notes to reference the Pima Associates of Government (PAG) 2015 Standard Specification for Public Improvements (SSPI) and Standard Details (SD). Revise plan set to reflect this change. 5. Revise General Grading and Paving Note 19 to indicate the asphaltic concrete shall conform to TDOT City Mix #2. 6. Provide TSMR case number on cover sheet and include a General Grading and Paving note describing the TSMR. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
03/06/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
03/06/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Reqs Change | |
03/06/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
03/06/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Reqs Change | |
03/06/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Reqs Change | |
03/06/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Reqs Change | |
03/06/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Reqs Change | |
03/06/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Reqs Change | |
03/06/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Reqs Change | |
03/06/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Reqs Change | |
03/06/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Reqs Change |