Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T19PI00002
Parcel: Unknown

Address:
220 S VOZACK LN

Review Status: Completed

Review Details: PIA - SUBMITTAL

Plan Number - T19PI00002
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/04/2019 ZCANCHO1 TRAFFIC ENG SIGN-STRIP Approved
03/07/2019 RICHARD LEIGH DOT ENGINEERING REVIEW Approv-Cond March 7, 2019


SUBJECT: Offsite Improvement Plans for Vozack Acres Lots 1-4

PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review

RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and recommends a conditional approval at this time. The following comments need to be addressed and plans revised prior to submitting mylar plan set for signatures. Please submit a PDF copy for review prior to submitting mylars.

1. Include the plan number "I-2019-002" in the title block of each sheet.

2. Include the PIA activity number "T19PI00002" on cover sheet.

3. Use TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering. Please note that the signatory titles should only be provided on cover sheet.

4. Sheet 1: Revise Paving Note 1 to reference the Pima Associates of Government (PAG) 2015 Standard Specification for Public Improvements (SSPI) and Standard Details (SD).

5. Sheet 2: Revise General Paving Note 5 to indicate the use of TDOT City Mix No. 2 for the asphaltic concrete.

If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov.
03/07/2019 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Completed
03/07/2019 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
03/07/2019 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
03/07/2019 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
03/07/2019 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
03/07/2019 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Completed
03/07/2019 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
03/07/2019 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
03/07/2019 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
03/19/2019 RLEIGH1 TRAFFIC ENG GENERAL Approved Zelin had no comments. See email ated 3/4/19

RL
03/19/2019 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
03/19/2019 RICHARD LEIGH DOT PERMITS & CODES REVIEW Approved RL
03/19/2019 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed