Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T19PI00002
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/04/2019 | ZCANCHO1 | TRAFFIC ENG | SIGN-STRIP | Approved | |
03/07/2019 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | March 7, 2019 SUBJECT: Offsite Improvement Plans for Vozack Acres Lots 1-4 PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and recommends a conditional approval at this time. The following comments need to be addressed and plans revised prior to submitting mylar plan set for signatures. Please submit a PDF copy for review prior to submitting mylars. 1. Include the plan number "I-2019-002" in the title block of each sheet. 2. Include the PIA activity number "T19PI00002" on cover sheet. 3. Use TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering. Please note that the signatory titles should only be provided on cover sheet. 4. Sheet 1: Revise Paving Note 1 to reference the Pima Associates of Government (PAG) 2015 Standard Specification for Public Improvements (SSPI) and Standard Details (SD). 5. Sheet 2: Revise General Paving Note 5 to indicate the use of TDOT City Mix No. 2 for the asphaltic concrete. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
03/07/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
03/07/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
03/07/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
03/07/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
03/07/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
03/07/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
03/07/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
03/07/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
03/07/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
03/19/2019 | RLEIGH1 | TRAFFIC ENG | GENERAL | Approved | Zelin had no comments. See email ated 3/4/19 RL |
03/19/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
03/19/2019 | RICHARD LEIGH | DOT PERMITS & CODES | REVIEW | Approved | RL |
03/19/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |