Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T19PI00001
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/06/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Please submit a landscape and irrigation plan for the project. |
03/11/2019 | ZELIN CANCHOLA | COMMENTS | COMMENTS | Reqs Change | March 11, 2019 SUBJECT: T19PI00001 MLK Jr Way PROJECT REVIEWER: Zelin Canchola, TDOT Review Section RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Traffic Engineering. The proposed plan requires the following change: Signs: 1. Identify Stop Sign Location at new Road connection to 22nd Street. 2. Add/identify no parking fire access signs (begin and end) along no parking area A/2 3. Add /identify no parking fire access signs (begin and end) along new cul de sac 4. Identify street name signs. If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov |
03/12/2019 | CSALTZM1 | DOT ENGINEERING | REVIEW | Denied | 1. Use TDOT engineering plan template for this plan set. The latest TDOT engineering plan template can be found at https://www.tucsonaz.gov/tdot/engineering. Please note that the signatory titles should only be provided on cover sheet. 2. Sheet 1of 4: General Note 4: Revise note to indicate the use of TDOT Mix No. 2 for the asphaltic concrete. 3. Sht. 1of 4: Add PIA Number T19PI00001 to cover sheet top center under Title. Remove: "(G-2019__)". 4. Sht. 1of 4: Remove Abbreviations table. Standard abbreviations are included in the PAG 2015 Standard Details. 5. All Sheets add plan number I-2018-022. 6. Sht. 2 of 4: Engineers Notes, note 12 Remove "OPERATORS" and replace with "Contractor". 7. Sht. 3 and 4 need scale for profile. 8. Sht. 3 and 4 need curve tables. 9. Sht. 3 and 4 need Detail of all Access Ramps with grades. Need to be able to check for ADA compliance. 10. Sht. 4 Profile show existing grade beyond Sta. 16+50.74. 11. Sht. 4 Plan E. Seabury CT. Revise to show improvements to remove hammerhead. |
03/19/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | Notified EOR that review comments have been posted. |
03/19/2019 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
03/19/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | Notified EOR that review comments have been posted. |
03/19/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
03/19/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
03/19/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
03/19/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
03/19/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
03/19/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
03/19/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
03/19/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
03/19/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed |