Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T19CM09372
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/26/2020 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | FROM: David Jellen PDSD Zoning Review Section PROJECT: T19CM09372 - New Buildings (Retail-General Merchandise / Food Services) Building Plan Review (2nd Review) Flex Space at Sunset Ranch / Related to DP19-0300 2706 N Silverbell Road / C-1 Zoning TRANSMITTAL DATE: February 7, 2020 DUE DATE: February 21, 2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the unapproved development package DP19-0300. While the building plans are consistent with the unapproved DP as it relates to the zoning review purview of the building footprint, building height, square footage, site conditions etc., zoning cannot approve the building plans until the DP has been approved and PDSD Commercial Plans reviewers have approved the building plans. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. 3. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the approved DP, the building plans can be approved by zoning. If you have any questions about this transmittal, Contact David Jellen at (520) 837-4082 or by email David.Jellen@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or Steve.Shields@tucsonaz.gov |
02/26/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Based on the private utility drawings in the development plan (DP19-0300), building #02 requires a backwater valve. |
02/26/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
02/26/2020 | MARTIN BROWN | FIRE | REVIEW | Reqs Change | Unable to review until DP is approved and separate addresses have been assigned to each building. |
03/09/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. This permit will not be approved until all four buildings have a separate permit number and an address. |
03/17/2020 | AMARTIN1 | ENGINEERING | REVIEW | Needs Review |